Installation guide for Cisco TelePresence MX800 Dual - Floor stand
19
Start up the system
•
Remove the protection foil from the displays.
•
Make sure the cameras can move freely.
•
Insert the network and power cables into the wall outlets.
•
Switch on the system.
The power switch is located directly below the codec, next to
the power connector.
Wait a few minutes while the system starts up. The start-up may
include automatic software upgrade and restart of Touch 10 and
cameras.
Follow the instructions on the Touch controller.
Cisco Spark: To find more information on how to get started with
Spark registered systems, visit
look for Getting Started articles for room systems.
Other services: For further information on set-up and
configuration, download the Getting Started Guide from the
Cisco web site,
78-100574-02A0 | 2016 JUNE | © 2016 Cisco Systems, Inc. All rights reserved.
http://help.ciscospark.com
http://www.cisco.com/go/mx-docs
and
Page 26