Familiarization Of Sjiii Series; Section 2- Familiarization - Skyjack SJIII 3219 Operating Manual

Dc electric scissors
Hide thumbs Also See for SJIII 3219:
Table of Contents

Advertisement

Section 2- Familiarization

2.1 Familiarization of SJIII Series

Aerial Platform Familiarization should be given only to individuals who are QUALIFIED And
Do not operate this aerial platform without proper authorization and training. Failure to avoid
It is the responsibility of the operator to read, completely understand and follow all
instructions and warnings contained in this operating manual and on the aerial platform.
Holding Valve
Manual Override
Knob
Emergency
Lowering
Valve
Base
Control
Console
Free-wheeling
Valve
SJIII DC Electric
WARNING
TRAINED to operate an aerial platform.
this hazard could result in death or serious injury.
Platform Control
Console
Manual
Box
Brake
(If Equipped)
Main Power
Disconnect
SJIII Series
SJIII 3226 & 4632
SJIII 3219
wheeling
2
1 2 1 2
1 2
Free-
Valve
Page 13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sjiii 3226Sjiii 4632

Table of Contents