Ring/Network coupling
The coupling between two networks is effected by the main line (thick blue
line), which is connected to the partner coupling port. If the main line fails, the
redundant line (thick blue dotted line), which is connected to the coupling
port, takes over coupling the two networks. The coupling is effected by one
Switch.
Select the Redundancy:Ring/Network Coupling dialog.
Select one-Switch coupling
2
I O
STAND-BY
Figure 24: One-Switch-coupling
1: Coupling port
2: Partner coupling port
The following settings apply to the Switch displayed in blue in the
selected graphic.
Select the partner coupling port
With "Partner coupling port" you specify at which port you are
connecting the control line.
The following tables show the selection options and default settings for the
ports used in the Ring/Network coupling.
60
5.2 Preparing a Ring/Network coupling
(see fig.
1
(see fig.
24).
25),
(see table
9).