3. Loosen the two Solenoid Installation ⊕ screws then move and adjust the Sole-
noid.
SOLENOID INSTALLATION
Figure 6-53. Adjustment of the Paper Route Switching Gate
4. Tighten the Solenoid ⊕ screws.
[Assembling Procedures]
1. Reinstall the Rear Cover and Top Cover by reversing the procedure above.
M M
L
0 0
⊕
SCREWS
Disassembling, Assembling & Adjustment
6-31