Power-On - Daikin BRC1E62 Installation Manual

Wired remote controller
Hide thumbs Also See for BRC1E62:
Table of Contents

Advertisement

5. Power-on

● Check for completion of indoor/outdoor units wiring.
● Check for closing of control box lid of indoor and outdoor units before turn on the power.
Followings is displayed after turn
5-1
on the power.
"Checking the connection.
Please stand by."
During above display, backlight
does not light by button operation.
When 1 indoor unit is
controlled by 2 remote
controllers:
Be sure to set sub remote
controller during above display.
Press and hold for 4 seconds or
longer the Mode Selector button
of the remote controller to be set.
When the display is changed from
main remote controller to sub
remote controller, the setting is
completed.
Basic screen is displayed.
5-2
CAUTION
If sub remote controller is not set at turn on the power in
the case of 1 indoor unit controlled by 2 remote
controllers, "Error code: U5" is displayed in the
connection checking screen.
Select the sub remote controller by pressing the Mode
Selector button of either one of the remote controllers for
4 seconds or longer.
If the Basic screen is not displayed more than 2 minutes
after "Sub RC" display, turn off the power and check the
wiring.
NOTE
When selecting a different language, refer to
<Main remote controller>
5-1
Checking the connection.
Please stand by.
Main RC
Error Code: U5
Checking the connection.
Please stand by.
Main RC
<Basic screen>
5-2
Fan
.
"12
Language"
<Sub remote controller>
5-1
Checking the connection.
Please stand by.
Main RC
Error Code: U5
Checking the connection.
Please stand by.
Main RC
Press and hold for 4 seconds
or longer the Mode Selector
button of sub remote
controller side.
Checking the connection.
Please stand by.
Sub RC
<Basic screen>
5-2
Fan
on page 23.
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents