Installation Of The Communication Option Led Display Cover - Mitsubishi Electric FR-F720-55K Instruction Manual

Fr-a7nf series inverter plug-in option fl remote communication function
Hide thumbs Also See for FR-F720-55K:
Table of Contents

Advertisement

2.2

Installation of the communication option LED display cover

Mount the cover for displaying the operation status indication LED for the communication option on the
inverter front cover.
1)
Cut off hooks on the rear of the inverter front
cover with nipper, etc. and open a window for
fitting the LED display cover.
Take caution not to hurt your hand and such with portions left by cutting hooks of the rear of
the front cover.
Cut off with a nipper, etc.
Cut off with a nipper, etc.
CAUTION
2)
Fit the communication option LED display
cover to the front of the inverter front cover
and push it into until fixed with hooks.
Fit it so that the position of
lenses is in the upper-right
of the LED display cover.
Fitting drawing
INSTALLATION
13
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents