Installation; Unpack And Inspect - GE F60 Instruction Manual

Feeder protection system
Hide thumbs Also See for F60:
Table of Contents

Advertisement

F60 Feeder Protection System
Chapter 3: Installation

Installation

This chapter outlines installation of hardware and software. You unpack, check, mount, and wire the unit, then install the
software and configure settings.

3.1 Unpack and inspect

Use this procedure to unpack and inspect the unit.
1.
Open the relay package and check that the following items have been delivered:
F60
Mounting screws
GE EnerVista™ DVD (software and documentation)
F60 Instruction Manual (soft copy on DVD; printed copy if ordered)
UR Family Communications Guide (soft copy on DVD; printed copy if Instruction Manual ordered)
Certificate of Calibration
Test Report
EC Declaration of Conformity
2.
Inspect the unit for physical damage.
3.
View the rear nameplate and verify that the correct model has been delivered. The model number is at the top right.
4.
For any issues, contact GE Grid Solutions as outlined in the For Further Assistance section in chapter 1.
5.
Check that you have the latest copy of the F60 Instruction Manual and the UR Family Communications Guide, for the
applicable firmware version, at
The Instruction Manual outlines how to install, configure, and use the unit. The Communications Guide is for advanced use
with communication protocols. The warranty is included at the end of this instruction manual and on the GE Digital Energy
website.
F60 FEEDER PROTECTION SYSTEM – INSTRUCTION MANUAL
http://gegridsolutions.com/multilin/manuals/index.htm
3-1

Advertisement

Table of Contents
loading

Table of Contents