Index - Carrier AquaEdge 23XRV Start-Up, Operation And Maintenance Instructions Manual

High-efficiency variable speed screw chiller with greenspeed intelligence and pic iii controls 50/60 hz hfc-134a
Table of Contents

Advertisement

Abbreviations and explanations
BACnet communication option
Before initial start-up
62-81
Carrier Comfort Network
Interface
®
Carrier Comfort Network communication
wiring
142
Capacity control
18
Capacity override
48
Chilled liquid recycle mode
Chiller control module (CCM)
Chiller dehydration
71
Chiller familiarization
5-13
Chiller identification nameplate
Chiller start-up (prepare for)
Chillers with storage tanks
87
Chiller tightness (check)
64
Cold weather operation
84
Compressor bearing maintenance
Compressor inlet bearing oil orifice
Compressor minimum speed override
Compressor rotor check
94
Condenser description
12
Condenser freeze prevention
Condenser pump control
53
Control algorithms checkout
procedure
98
Control center
description
12
check before start-up
74
inspect
90, 95
Control modules
119
Controls
18-60
Controls (definitions)
18
Controls overview
18
Controls schematics
130-134
Control test
78, 98
Cooler, description
12
Default screen freeze
47
Defective ICVC modules
(replacing)
120
Demand limit control option
Design set points (input)
75
Display messages (checking)
Equipment required
62
Extended shutdown (preparation for)
Extended shutdown (after)
84
Fast power source transfers
Field wiring schematic
138
Gateway status LEDs
121
General maintenance
89, 90
Ground fault troubleshooting
Head pressure output reference
Heat exchanger tubes (inspect)
High altitude locations
79
Hot gas bypass (optional) algorithm
ICVC operation and menus
ICVC parameter index
145-152
Initial start-up checklist
CL-1 to CL-10
Input power wiring
73
Instruct the customer operator
Job data required
62
Lead/lag control
56
Lead/lag control wiring
143,144
Leak test chiller
64
Limited shutdown, after
84
Liquid piping, inspecting
71
Liquid/brine temperature reset
Local occupied schedule (input)
Local start-up
60
Lubrication cycle
16-18
Lubrication cycle (details)
16
Lubrication cycle (summary)
Lubrication system (check)
Maintenance log
153-156
Module operation (notes)
119
© Carrier Corporation 2014
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53230011-01
Motor-compressor description
5
Motor cooling cycle
157-163
Motor insulation
Muffler description
75
Network device control, attaching to
Oil and oil filter changes
Oil charge
Oil circuit valves (open)
Oil heater
61
Oil pressure and compressor
119
stop (check)
Oil reclaim system
Oil specification
5
Oil strainers
82,83
Oil sump temperature control
Operating instructions
Operating the optional pumpout unit
Operator duties
94
Optional flow device calibration
92
Optional pumpout compressor
48
liquid piping (check)
Optional pumpout system controls
and compressor (check)
53
Optional pumpout
system maintenance
Optional storage tank and
pumpout system (using)
Ordering replacement chiller parts
Overview (troubleshooting guide)
Physical data
PIC III system components
PIC III system functions
Preparation (pumpout and
refrigerant transfer procedures)
Pressure transducers
Prevent accidental start-up
Pumpout and refrigerant
transfer procedures
Ramp loading
Refrigerant (adding)
Refrigerant (adjusting the charge)
54
Refrigerant charge (trim)
Refrigerant filter/drier
97
Refrigerant float system (inspect)
Refrigerant into chiller (charge)
84
Refrigerant leak detector
Refrigerant leak rate
53
Refrigerant leak testing
Refrigerant properties
Refrigerant (removing)
Refrigerant tracer
74
Refrigeration cycle
54
Refrigeration log
94
Relief valves (check)
Relief valves and piping (inspect)
54
Remote start/stop contacts
23
Remote reset of alarms
Repair the refrigerant leak retest
and apply standing vacuum test
Restart after power failure
82
Running system (check)
Safety and operating
controls (check monthly)
Safety considerations
Safety controls
Safety shutdown
Scheduled maintenance
53
Service configurations (input)
75
Service ontime
Service operation
Shipping packaging (remove)
Shunt trip
16
Shutdown sequence
90
Soft stop amps threshold, automatic
Software configuration
Printed in U.S.A.

INDEX

12
16
94
12
58
90
62
62
91
82
17
91
91
48, 52
83-85
86
83
78
72
79
95
62
96
96
125
18
45
86
78, 95, 97
82
86-89
48
89
89
90
91
92
79
52
89
89
89
89
64
13-15
84
72
94
52
52
90
53
83
90
1,2
47
62
90-96
75
90
59
62
47
61
61
75
Form 23XRV-5SS
Spare alarm contacts
Spare safety inputs
Spare temperature inputs
Start the chiller
83
Start-up, initial
82,83
Start-up, initial preparation
Start-up/shutdown/recycle
sequence
60-62
Stop the chiller
83
Storage vessel (optional) description
System components
Temperature sensors (checking)
Test after service, repair or
major leak
89
Tighten all gasketed joints
Tower fan relay low and high
Troubleshooting guide
Vaporizer refrigerant return
line orifice
91
Vaporizer temperature control
VFD, identify
72
VFD refrigerant strainer
VFD schematic
135-138
Water/brine leaks
Water/brine treatment
Weekly maintenance
Wiring, inspecting
Wiring schematics
CCN communication wiring
Controls
130-134
Field wiring
138-141
Lead/lag control wiring
VFD schematics
Pg 164
1016
11-14
52
52
52
82
12
5
97
62
53
96-144
48
91
94
95
90
74
142
143, 144
135-137
Replaces: 23XRV-4SS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents