Index - Carrier 23xl Start-Up, Operation And Maintenance Instructions Manual

Hermetic screw liquid chillers with hcfc-22 and hfc-134a, 50/60 hertzpic ii controls
Hide thumbs Also See for 23xl:
Table of Contents

Advertisement

Abbreviations and Explanations, 5
After Limited Shutdown, 67
Attach to Network Device Control, 45
Automatic Soft Stop Amps Threshold, 48
Auto. Restart After Power Failure, 41
Before Initial Start-Up, 49
Carrier Comfort Network Interface, 59
Capacity Override, 38
Chilled Water Recycle Mode, 49
Chiller Control Module (CCM), 89
Chiller Dehydration, 58
Chiller Familiarization, 5
Chiller Identification Nameplate, 5
Chiller Operating Condition (Check), 66
Chillers with Isolation Valves, 70
Chiller Start-Up (Prepare for), 66
Chillers with Storage Tanks, 71
Chiller Tightness (Check), 49
Cold Weather Operation, 67
Compressor Bearing Maintenance, 75
Compressor Rotor Check, 75
Condenser, 8
Condenser Freeze Prevention, 40
Condenser Pump Control, 40
Control Algorithms Checkout Procedure, 78
Control Panel, 8
Control Panel (Inspect), 73
Control Modules, 88
Controls, 14
Controls (Definitions), 14
Control Test, 63, 78
Cooler, 8
CVC Operation and Menus, 19
Default Screen Freeze, 38
Defective Processor Modules (Replacing), 89
Demand Limit Control Option, 41
Design Set Points, (Input), 60
Display Messages (Checking), 77
Dry Run to Test Start-Up Sequence, 65
Equipment Required, 49
Extended Shutdown, (Preparation for), 67
Extended Shutdown (After), 67
Factory-Mounted Starter (Optional), 8
General Controls Overview, 14
General Maintenance, 72
Heat Exchanger Tubes (Inspect), 75
High Altitude Locations, 63
Hot Gas Bypass (Optional) Algorithm, 41
Ice Build Control, 44
Initial Start-Up, 65
Initial Start-Up (Preparation), 65
Inspect Water Piping, 58
Instruct the Customer Operator, 66
Integrated Starter Module (ISM), 89
Introduction, 4
Job Data Required, 49
Lead/Lag Control, 42
Leak Test Chiller, 50
Local Occupied Schedule (Input), 60
Local Start-Up, 47
Low Discharge Temperature Control, 39
Lubrication Cycle, 8
Lubrication Cycle (Details), 8
Lubrication Cycle (Summary), 8
Lubrication System (Check), 73
Module Operation (Notes), 88
Motor-Compressor, 8
Motor Cooling Cycle, 8
Muffler-Oil Separator, 8
Oil and Oil Filter Changes, 73
Oil Charge, 60
Oil Circuit Valves (Open), 49
Oil Loss Prevention, 9
Oil Pressure and Compressor Stop (Check), 65
Oil Reclaim System, 9
Oil Separator Coalescer, 74
Oil Specification, 74
Copyright 1999 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
PC 211
Book 2
Tab
5e
Catalog No. 532-306
Printed in U.S.A.

INDEX

Oil Sump Temperature Control, 39
Operating Instructions, 66
Operating the Optional Pumpout Unit, 69
Operator Duties, 66
Optional Pumpout Compressor Water Piping (Check), 58
Optional Storage Tank and Pumpout System (Using), 49
Optional Pumpout System Controls and Compressor (Check), 63
Optional Pumpout System Maintenance, 76
Ordering Replacement Chiller Parts, 76
Overview (Troubleshooting Guide), 76
Physical Data, 92
PIC II System Components, 14
PIC II System Functions, 37
Power Up the Controls and Check the Oil Heater, 60
Preparation (Pumpout and Refrigerant Transfer Procedures), 69
Pressure Transducers (Check), 76, 77
Prevent Accidental Start-Up, 66
Pumpout and Refrigerant Transfer Procedures, 69
Ramp Loading, 38
Refrigerant (Adding), 72
Refrigerant (Adjusting the Charge), 72
Refrigerant Charge (Trim), 72
Refrigerant Filter/Drier, 74
Refrigerant Float System (Inspect), 74
Refrigerant Into Chiller (Charge), 64
Refrigerant Leak Rate, 72
Refrigerant Leak Testing, 72
Refrigerant Leak Detector, 40
Refrigerant Properties, 72
Refrigerant (Removing), 72
Refrigerant Strainers,74
Refrigerant Tracer, 49
Refrigeration Cycle, 8
Refrigeration Log, 67
Relief Valves (Check), 58
Relief Valves and Piping (Inspect), 74
Remote Start/Stop Controls, 40
Repair the Leak, Retest, and Apply Standing Vacuum Test, 72
Running System (Check), 66
Safety and Operating Controls (Check Monthly), 73
Safety Considerations, 1
Safety Controls, 38
Safety Shutdown, 49
Scheduled Maintenance, 73
Service Configurations (Input), 60
Service Ontime, 73
Service Operation, 46
Shipping Packaging (Remove), 49
Shunt Trip (Option), 38
Shutdown Sequence, 48
Slide Valve Operation, 67
Slide Valve Principle, 12
Software Configuration, 60
Solid-State Starters, 89
Spare Safety Alarm Contacts, 40
Spare Safety Inputs, 40
Start the Chiller, 66
Starter (Check), 59
Starting Equipment, 12
Starting Equipment (Inspect), 75
Start-Up/Shutdown/Recycle Sequence, 47
Stop the Chiller, 67
Storage Vessel (Optional), 8
System Components, 5
Temperature Sensors (Checking), 77
Test After Service, Repair, or Major Leak, 72
Tighten All Gasketed Joints, 49
Tower Fan Relay Low and High, 40
Troubleshooting Guide, 76
Unit-Mounted Solid-State Starter (Optional), 13
Unit-Mounted Wye-Delta Starter (Optional), 13
Water/Brine Reset, 41
Water Leaks, 75
Water Treatment, 75
Weekly Maintenance, 73
Wiring (Inspect), 58
Form 23XL-3SS
Pg 104
7-99
Replaces: New

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents