Download Print this page

MOTO GUZZI NEVADA Service Station Manual page 60

Hide thumbs Also See for NEVADA:

Advertisement

Electrical system
13 Medium black clamps 190x4.5
5 Small black 160x2.5 clamps
1 Cable guides
3 Cable grommet (there are various types of cable grommets)
2 Profile guards (140mm long)
1 Miu3 bracket
1 Tcei M8x40 screw
1 Black sheath D16 S0.4
6 Cable guides (there are various types of cable guides)
Motorcycle division
The wiring timing is subdivided in three essential
sections, as indicated in the figure.
1. Front section
2. Central section
3. Rear part
4. ENGINE
SPECIAL CHECKS FOR THE CORRECT CONNECTION AND LAYING OF CABLES
It is extremely important that any security-locks for the following connectors are properly con-
nected and correctly tightened to ensure proper engine, and therefore proper vehicle, operation.
Carry out the checks listed below.
1. Check control unit connection and correct insertion of the relative rubber plug.
2. Check the correct fastening of metallic bracket screw on the throttle body.
3. Check the right and left injectors connection.
4. Check the water temperature sensor connection (Blue connector).
5. Check correct insertion of H.V. Cables with Coils.
6. Check whether the Grey H.V. Cable connects on the Coil with the Grey tape.
7. Check whether the Grey H.V. Cable goes to the Left engine head.
8. Check the Coils connection.
9. Check correct insertion of the engine oil hood and the presence of the clamp.
10.Check ground fastening on the engine, starter motor positive and relative hood.
11.Check NEUTRAL cable fastening.
12.Check whether the right lambda probe is connected to the output labelled "LAMBDA DX" (RH
LAMBDA).
13.Check Regulator and Flywheel connection.
14.Check whether the right lambda probe is inserted on the cable grommet under the clutch housing.
15.Check right and left Lambda connections.
ELE SYS - 60
NEVADA - NEVADA ANNIVERSARIO

Advertisement

loading

This manual is also suitable for:

Nevada anniversario