External Battery Conection(For Extend Model Only ) - KStar 6K-H Manual

6k/10k series
Table of Contents

Advertisement

4)
Connect all the outputs of the parallel UPS to one patch board
before connect to the loads. See the picture as follows.
5)
Start one UPS in turn and set parameters through LCD:
working mode: parallel mode; parallel ID: setting ID in
sequence; total numbers in parallel: according to the actual
numbers; parallel redundancy sets: setting when redundancy
requirement (See the Manual Chapter 4.3.1; 4.3.9; 4.3.10;
4.3.11 for more methods of parameter setting).
6)
Start UPS at the same time or in turn, they will provide power
supply to loads in parallel operation after finishing setting the
ups. Additional, it can also be communicated and setted with
PC through RS232. See the steps as below.
1. Start up the UPS one by one, connect RS232 to the computer,
start up software and manual are included in the CD-ROM.
2.
Open the set up interface to set up relevant parameters as
below:
3.
After finishing setting up,the UPS can be started up at the
same time or one by one. The UPS will work in parallel to
supply power to the loads.
NOTICE: When the UPS in parallel, the input can be the same or
different, but the output should be paralleled to one patch board.
3.6 External battery connection (for extend model only)
Make sure battery quantity complies with the specs (16/18/20
1)
pieces of 12V battery in parallel) . Measure the voltage of battery
bank after finishing connection and the battery voltage should be
around 192/216/240Vdc.
Work mode, parallel operation;
Parallel ID: Set up the ID one by one;
Parallel amount: set the amount in parallel.
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6k-s10k-h10k-sUdc9100 series

Table of Contents