Service Instructions; Measurements And Tests; Z001 Main Circuit Card; Primary Rectifier - Kemppi Master S 400 Service Manual

Hide thumbs Also See for Master S 400:
Table of Contents

Advertisement

Service manual Master S 400 and 500
Version 1.1
5.9.2014

4. SERVICE INSTRUCTIONS

4.1. Measurements and tests

Master has only few measurements that can be done because control circuitry is integrated to Z001 card
and panel does have only potentiometer and few press buttons.

4.1.1. Z001 Main circuit card

4.1.1.1. Primary rectifier

not
Supply voltage must
be connected during the block diode measuring.
Primary rectifier
Input 3 phases
-
+
Output (DC-link)
Check the diode module using a multimeter diode function to measure its threshold voltage. Diodes must
be measured both forward bias and reverse bias condition to make sure they are fully functional. See the
picture above.

4.1.1.2. IGBT

not
Mains supply voltage must
be connected during the IGBT module diode measuring.
IGBT module can be tested by a multimeter when using the diode tester function. The module holds 4
IGBTs and diodes in parallel with IGBT. Typically these diodes fail or cannot be measured if IGBT module
is broken.
14
Kemppi Oy

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Master s 500

Table of Contents