Severity
Critical
Serviceable
Automatically notify support
User Response
Complete the following steps:
1. Reseat Node. If fault still persist, replace node.
• A9 : Node10_BMC_Fault
The management device on indicated node is not responding.
Severity
Critical
Serviceable
Automatically notify support
User Response
Complete the following steps:
1. Reseat Node. If fault still persist, replace node.
• AA : Node11_BMC_Fault
The management device on indicated node is not responding.
Severity
Critical
Serviceable
Automatically notify support
User Response
Complete the following steps:
1. Reseat Node. If fault still persist, replace node.
• AB : Node12_BMC_Fault
The management device on indicated node is not responding.
Severity
Critical
Serviceable
Automatically notify support
User Response
Complete the following steps:
1. Reseat Node. If fault still persist, replace node.
• AC : PSU_Unbalance
All installed power supplies occupy only one side of the chassis and are in diagnal to the side where all
powered-on nodes occupy. An unbalance power distribution condition is likely to occur.
Severity
Critical
Serviceable
Automatically notify support
Appendix A. Fan power control (FPC) error codes