Attaching The Side Cable Duct - Fujitsu 2737 User Manual

19-inch rack
Table of Contents

Advertisement

4.9

Attaching the Side Cable Duct

The procedure for attaching the side cable duct is shown below.
■ Confirm the components, and prepare the necessary tools.
Confirm that all components have been delivered (see the table below).
Front panel
Side cable duct body
Rear bracket
M5 self-tapping screw
M6 screw
M6 cage nut
Also, prepare the necessary tools:
・ Phillips screwdriver (No. 2 bit): For M5 self-tapping screws
・ Phillips screwdriver (No. 3 bit): For M6 screws
・ Cage nut tool:
The procedure for attaching the side cable duct is as follows:
1
Insert cage nuts.
2
Temporarily secure the rear bracket.
3
Insert the side cable duct body.
4
Secure the rear bracket, the side cable duct body, and the front panel.
The procedure for attaching the side cable duct is shown below.
(Example: When attached to the left of the rack)
*
If the cable holder is already attached to the location for attaching the side cable duct, remove the
cable holder.
174
The supplied screws for securing the duct are self-tapping screws. Each screw
requires a certain degree of strength to tighten since it cuts its own thread as it is
screwed into its hole.
The inside of the duct is separated into three sections. When laying many cables,
divide the cables evenly into each section. Use the following as a rough guide to
determine the number of cables passing through the duct:
・Allowable number of cables in one side cable duct
The capacity in the case of LAN cables (each with a diameter of 5 mm) is about
90 cables.
Side cable duct Type name: 19R-27SD1
Product name
For M6 cage nuts
Quantity
1
1
1
4
2
2

Advertisement

Chapters

Table of Contents
loading

Table of Contents