Eaton 9140 Installation Manual page 61

Powerwave series
Hide thumbs Also See for 9140:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 17
Table 10. User Settings (continued)
Description
Language
XCP Load Control
Upper Bypass V
Lower Bypass V
Bypass Freq Dev
(Bypass Frequency Deviation Limits)
Qualify Bypass
Allow Bypass
Set Baud Rate
Set Site (Wiring) Fault
Contact Config*
Frequency Converter Mode
* Changes to these options should be made before turning on the UPS (while the UPS is in Standby mode); otherwise,
the changes do not take effect.
®
Eaton
Available Settings
Select Language: <English> <Spanish>
<French> <German> <Finnish>
[Enabled][Disabled]
+0 through +20% (1% increments)
-0 through -20% (1% increments)
1 through 5 Hz (1 Hz increments)
NOTE This value sets the limits from 1 Hz to
5 Hz of the nominal output configuration.
[Enabled][Disabled]
NOTE This setting enables or disables the
bypass qualification rules. When set to
Disabled, Bypass is always available.
[Enabled][Disabled]
Port 1 (RS232): [19200] [9600] [2400] [1200]
Port 2 (SERVICE): [19200] [9600] [2400] [1200]
[Enabled][Disabled]
Contact Usage: [REPO][ROO][Disabled]
Contact Type: [N/O][N/C]
[Enabled][Disabled]
NOTE If bypass input fails while operating on
second feeder input and neither utility
frequency nor bypass frequency is available
to sync with, the UPS operates with different
frequencies for output and input. When this
setting is Enabled, the UPS operates at a 50%
derating to continue to meet operating
specifications. When set to to Disabled, the
UPS operates with no load derating.
9140 (9910-E82/E83) UPS Installation Guide for IBM
Default Setting
English
Enabled
+20%
-20%
3 Hz
Enabled
Enabled
9600
Disabled
REPO
N/O
Enabled
S
®
Applications
164201715 Rev 2
www.eaton.com/ibm
OPERATION
45

Advertisement

Table of Contents
loading

Table of Contents