Eaton 9140 Installation Manual page 24

Powerwave series
Hide thumbs Also See for 9140:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 17
INSTALLATION
8
®
Eaton
9140 (9910-E82/E83) UPS Installation Guide for IBM
www.eaton.com/ibm
3.
Using two M5 machine screws and an adapter plate, attach the rail
to the front of the rack (see Figure 1 and Figure 2).
Do not tighten the screws.
4.
Adjust the rail size on the rail assembly for the depth of your rack
(see Figure 3).
Rear
Figure 3. Adjusting the Rail Depth (Right Rail Assembly Shown)
Front M5 Screws
Figure 2. Securing the Front Rail
S
®
Applications
164201715 Rev 2
Position 6
Position 5
Position 4
Position 1
Adapter Plate
Front

Advertisement

Table of Contents
loading

Table of Contents