CAME ZL90 Installation Manual

CAME ZL90 Installation Manual

For 24v operators z24 series
Hide thumbs Also See for ZL90:

Advertisement

CONTROL PANEL
FOR 24V OPERATORS
INSTALLATION MANUAL
ZL90
EN
English

Advertisement

Table of Contents
loading

Summary of Contents for CAME ZL90

  • Page 1 CONTROL PANEL FOR 24V OPERATORS INSTALLATION MANUAL ZL90 English...
  • Page 2: Intended Use And Application

    The overall power of the motors must not exceed 480W. 3 Reference Standards For its quality processes management Came Cancelli Automatici is ISO 9001:2000 certified, and for its environmental management it is ISO 14001 certified. Came designs and manufactures entirely in Italy.
  • Page 3: Main Components

    4.1 - DIMENSIONS, SPANS AND ANCHORING HOLES 4.2 - MAIN COMPONENTS Transformer M1 motor fuse M2 motor fuse Line fuse Accessories fuse Control unit fuse Buttons for calibrating the stroke Buttons for memorising the radio code Control and signalling LED unit Functions selectors (2 way) Functions selector (10 way) Plug for the remote control...
  • Page 4: Installation

    5 Installation 5.1 - PRELIMINARY CHECKS Before installing do the following: • Check that the panel’s anchoring point is protected from possible blows, and that the anchoring surface is solid. Also check that the anchoring is done using the appropriate bolts, screws etc. •...
  • Page 5: Electrical Connections

    Insert the pressure hinges into the box (on the left or right as you wish) and set them using the provided screws and washers 15 mm~ Snap the cover into place onto the hinges. Close it and fix it using the provided screws After the adjustments and settings, fix the cover using the provided screws.
  • Page 6 6.2 - CONNECTING TO THE GEARMOTORS FROG-J / A1824 FROG-J / A1824 M1 - 24V d.c. gearmotor M2 - 24V d.c. gearmotor featuring delayed action on opening featuring delayed action on closing BLUE BLACK BLACK BROWN BROWN BLUE 6.3 - POWER SUPPLY TO ACCESSORIES Power supply Terminals for powering the following accessories: 230V (a.c.) 50/60 Hz...
  • Page 7: Common Procedure

    6.4 - ELECTRICAL LOCK ZL90 allows you to connect, alternatively to the indicator light on 10-5, a 12V (15W max) electrolock, and if necessary also the “Ram Blow” function. After hooking it up as shown in the illustration, proceed as follows:...
  • Page 8 6.6 - SAFETY DEVICES DIR photocells “partial stop” (N.C.) socket - input for safety devices such as photocells, sensitive edges and other EN 12978-compliant devices. Halts moving gate leaves and causes them to automatically close Dip 1 OFF - DIP 2 OFF (2 way dip) - or - “Stand-by Obstacle”...
  • Page 9: Command Devices

    6.7 - COMMAND DEVICES Stop button (N.C. socket) - Button to stop gate while excluding the automatic closing cycle. For movement to resume you must press the command button or transmitter button. Key selector and/or opening button (N.O. socket) - Gate opening command. Key selector and/or partial opening button (N.O.
  • Page 10: Selecting Functions

    7 Selecting functions 10 WAY DIP SWITCH 1 2 3 4 5 6 7 8 9 10 M2 N2 ENC2 10 11 E1 1 2 3 3P 4 5 7 CX CY TS B1 B2 1 ON - Automatic closing - the automatic closing timer is activated when on opening the gate leaf has reached the full open stroke. The time is preset and adjustable, and is subject to the action of any safety devices.
  • Page 11: Signal Led

    8 Adjustments 26V 17V 0V T.PROTECTION Trimmer Adjusts the waiting time when gate is open. Once this time has elapsed, the gate closes automatically. The waiting time can be adjusted anywhere between 1 and 150 seconds. Trimmer Adjusts the waiting time of the second motor during each closing run. The waiting time can be adjusted DELAY 2M anywhere between 1 and 16 seconds.
  • Page 12 10 Automatic calibration of the gate run Warning! With single-leaf gates, connect the gearmotor to terminals M2-N2-ENC2. The calibration procedures are the same as those described below 10.1 - PRELIMINARY ASSESSMENT OF THE DIRECTION OF MOVEMENT DURING OPENING - Release both gearmotors (see paragraph on “manual release” in the installation manual), position the gate leaves to be half-way open, block the gearmotors again.
  • Page 13 10.2 - PROCESS FOR AUTOMATIC CALIBRATION OF THE GEARMOTORS - Position the gate leaves so that they are half-way open by pressing on the “OPEN MOTOR” button. - Press the “SET UP” button for about 3 seconds. - The gate leaf of the second gearmotor perform a closing run and an opening run, ..Then, the gate leaf of the the fi...
  • Page 14: Activating The Remote Control

    11 Activating the remote control 11.1 - ANTENNA Possible output of the radio receiver’s second channel (N.O. socket). Connect the antenna’s RG58 cable to Socket rating: 5A-24V (d.c.). the apposite terminals. 11.2 - RADIOFREQUENCY CARD Lock the radiofrequency card into the electronic card AFTER CUTTING OFF THE POWER SUPPLY (or after disconnecting the batteries).
  • Page 15 11.3 - TRANSMITTERS ATOMO See instructions attached to AF43SR radiofrequency card AT01 • AT02 AT04 TOUCH TOP-432NA • TOP-434NA TCH 4024 • TCH 4048 TOP-432S TOP-302A • TOP-304A TOP-432A • TOP-434A T432 • T434 • T438 T132 • T134 • T138 TAM-432SA T152 •...
  • Page 16 11.4 - MEMORISATION CH1 = Channel for direct command to a function of the the gearmotor’s card, (“open only / “open-close-invert” or “open-stop-close- stop” command, depending on the choice made on DIP switches 2 and 3). CH2 = Channel for direct command an accessory device connected to B1-B2. 1) Keep the CH1 button on the electronic card pressed.
  • Page 17: Manufacturer's Declaration Of Conformity

    EN 61000-6-3 tel (+39) 0422 4940 - fax (+39) 0422 4941 EN 13241-1 internet: www.came.it - e-mail: info@came.it Declares under its own responsibility that the equipments for automatic garage doors and gates listed below: ZL90 … comply with the National Law related to the following European Directives and to the applicable parts of the following Standards.
  • Page 18 (+34) 91 52 85 009 127273, Moscow Moscow (+34) 91 46 85 442 (+7) 495 739 00 69 (+7) 495 739 00 69 (ext. 226) CAME United Kingdom Ltd. CAME United Kingdom Ltd. GREAT BRITAIN PORTUGAL CAME Portugal CAME Portugal...

Table of Contents