Appropriate Measures For Different Symptom; Outdoor Unit Test Operation Flow - Samsung AM080FXWANR Service Manual

System air conditioners outdoor unit
Hide thumbs Also See for AM080FXWANR:
Table of Contents

Advertisement

Troubleshooting

4-3 Appropriate Measures for Different Symptom

4-3-1 Outdoor Unit Test Operation Flow

Preliminary check for the Test Operation
Execute the Auto Trial Operation
Was Auto Trial Operation
Samsung Electronics
Power On
Completed?
Yes
Trial Operation available
No
If the Auto Trial Operation is not completed- UP is
displyed(UnPrepared)
Prior to starting the air conditioning operation after the initial
installation and Auto Trial Operation is carried out.
This process, the stable operation to protect the system and verify
the defect of the product.
1. Tracking is complete and after the initial installation, if you do not
have a history of Auto Trial Operation is completed, UP will be
displayed.
2. Execute the Auto Trial Operation by Tact Switch.
3. UP display disappears after Auto Trial Operation is complete, normal
operation is possible.
4. Auto Trial Operation is completed, if there is a history, normal
operation execution.
LED display the UP (UnPrepared)
79

Advertisement

Table of Contents
loading

Table of Contents