CAME A 3006 Installation Manual
CAME A 3006 Installation Manual

CAME A 3006 Installation Manual

Operator for swing gates
Hide thumbs Also See for A 3006:

Advertisement

Quick Links

OPERATOR FOR SWING GATES
ATI
SERIE
INSTALLATION MANUAL
A 3000/3006/3100/3106
A 5000/5006/5100/5106

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the A 3006 and is the answer not in the manual?

Questions and answers

Summary of Contents for CAME A 3006

  • Page 1 OPERATOR FOR SWING GATES SERIE INSTALLATION MANUAL A 3000/3006/3100/3106 A 5000/5006/5100/5106...
  • Page 2: Legend Of Symbols

    4.00 5.00 3 Reference Standards For its quality processes management Came Cancelli Automatici is ISO 9001:2000 certified, and for its environmental manage- ment it is ISO 14001 certified. This product complies with the following standards: see declaration of conformity. 4 Description 4.1 Gearmotor...
  • Page 3: Description Of Parts

    4.3 Description of parts 1) Gearmotor 2) Front bracket 3) Back swivel-joint 4) Back bracket 5) Anchoring plate 4.4 Overall dimensions A 5000/5006/5100/5106 A 3000/3006/3100/3106 Travel Travel 5 Installation Installation must be carried out by expert qualified personnel and in full compliance with current regulations. 5.1 Preliminary checks Before installing, do the following: •...
  • Page 4: Tools And Materials

    5.2 Tools and materials Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and compliance with the current standards and regulations. 5.3 Cable list and minimum thickness Connections Type of cable Length of cable 1 <...
  • Page 5 5.5 Mounting The following applications are only examples, in that the space available for fixing the operator and accessories varies depen- ding on the dimensions. It is thus up to the installer to choose the most suitable solution. Tab. 3 Pillar Gate leaves up to 3 m Hinge...
  • Page 6 Anchoring plate Level the bracket Front bracket With the gate closed apply the anchoring plate to the gate leaf, making sure that the front bracket is lined up horizontally with the back bracket and ensuring that measurement E is met. Carter Unscrew the two screws and remove the carter.
  • Page 7 5.6 Release with customised key Only for: A3000/A3006 Door A5000/A5006 Release only with motor stopped: 1) raise the door; 2) insert and turn key which immediately releases door; 3) manually push or pull gate leaf. To lock gate leaf again into place just insert key again and turn. 5.7 Adjusting opening STOP microswitch Microswitch actuating sled Microswitch...
  • Page 8 5.8 Connecting to the ZA3N/ZM2 control panels Connecting 2 motors Connecting 1 motor...
  • Page 9 5.9 Application for outward opening Tab. 4 A3000-3006 A5000-5006 3100-3106 5100-5106 130 mm 200 mm 130 mm 200 mm 720 mm 620 mm Outward Inward Extra bracket - Measure values A and B (Tab. 4) - Secure the tail bracket to an extra bracket and apply to post. - Open gate (max 90°), measure value E (Tab.
  • Page 10: Safety Instructions

    6 Safety instructions Important safety instructions This product must only be employed for its originally intended use. Any other use is wrong and potentially dangerous. The manufacturer cannot be held liable for any damages resulting from wrongful, erroneous or negligent uses. Avoid working close to the hinges or other moving mechanical parts.
  • Page 11: Periodic Maintenance

    7 Maintenance 7.1 Periodic maintenance Periodic maintenance to be carried out by the end-user is as follows: wipe clean the glass surface of the photocells; check that the safety devices work properly; remove any obstructions. We suggest checking the state of lubrication and tightness of the anchoring screws on the operator. To check the efficiency of the safety devices, move an object in front of the photocells when gate is closing.
  • Page 12: Extraordinary Maintenance

    8 Maintenance Periodic maintenance log (for end-user) (every 6 months) Date Notes Signature 8.1 Extra-ordinary maintenance The following table serves to note down any extra-ordinary maintenance, repairs or improvements performed by specia- lised firms. N.B.: Any extra-ordinary maintenance must be performed by specialised technicians. Extra-ordinary maintenance Installer’s stamp Technician’s name...
  • Page 13: Phasing Out And Disposal

    CAME cancelli automatici s.p.a. employs a UNI EN ISO 14001 certified and compliant environmental protection system at its plants, to ensure that environmental safeguarding. We ask you to keep protecting the environment, as CAME deems it to be one of the fundamental points of its market operations strategies, by simply following these brief guidelines when disposing: DISPOSING OF THE PACKING MATERIALS The packing components (cardboard, plastic, etc.) are solid urban waste and may be disposed of without any particular difficulty,...
  • Page 14 CAME UNITED KINGDOM LTD UNIT 3, ORCHARD BUSINESS PARK TOWN STREET, SANDIACRE NOTTINGHAM - NG10 5BP - U.K. Tel - 0044 115 9210430 Fax - 0044 115 9210431...

This manual is also suitable for:

A 3000A 3100A 3106A 5000A 5006A 5100 ... Show all

Table of Contents