3. Specifications

Model
Noise level (50/60 Hz)
External static pressure
Indoor units
Total capacity
Model
Quantity
Operation
Standard type
temperature
Fresh air intake
type

4. Confirmation of parts attached

1 Wire clamping plate
Model
P700 ~ P800
5 Connecting pipe for indoor unit
(gas side ø34.93)
Model
P700 ~ P800
9 Connecting pipe for indoor unit
(liquid side) <bottom piping>
Model
P700 ~ P800
Note:
The crossover connecting pipes 0 0 0 0 0 and A A A A A can be used for the standard installation
(installing the compressor unit (Right side) and heat exchanger unit (Left side) with a gap of 10 mm in between).

5. Space required around unit

[Fig. 5.0.1] (P.2)
<A> Top view
<C> When there is little space up to an obstruction
A Front
B No restrictions on wall height (left and right)
C Air outlet guide (Procured at the site)
E Heat exchanger unit
G Wall height (H)
(mm)
L
L
L
1
2
3
450
100
250
(1) Basic space required
(2) When there is an obstruction above the unit
(3) When inlet air enters from right and left sides of unit
Wall heights "H" of the front and the back sides shall be within total height of
unit.
When wall height "H" exceeds total height of unit, add "h" dimension to L
L
of the Fig. 5.0.1.
2
"h" = wall height "H'" – total height of unit

6. Lifting method

[Fig. 6.0.1] (P.2)
Caution:
Be very careful to carry product.
- Do not have only one person to carry product if it weighs more than 20 kg.
- PP bands are used to pack some products. Do not use them as a mean for transportation because they are dangerous.
- Do not touch heat exchanger fins with your bare hands. Otherwise you may cut your hands.
- Tear plastic packaging bag and scrap it so that children cannot play with it. Otherwise plastic packaging bag may suffocate children to death.
- When carrying outdoor unit, be sure to support it at four points. Carrying with 3-point support may make outdoor unit unstable, resulting in it falling.
8
PUHY-P700
62 dB<A>
Cooling mode: – 5 °CDB ~ 43 °CDB (0 °CDB ~ 43 °CDB with outdoor unit at lower position)
Heating mode: – 20 °CWB ~ 15.5 °CWB
Cooling mode: 21 °CDB ~ 43 °CDB
Heating mode: – 12.5 °CWB ~ 20 °CWB
2 Conduit mounting plate (ø53)
1 pc.
1 pc.
6 Packing (inside ø23, outside ø35)
1 pc.
1 pc.
0 Crossover connecting pipe be-
tween the compressor unit and
heat exchanger unit (gas side)
1 pc.
1 pc.
<B> Side view
D Compressor unit
F Must be open
H No restrictions on wall height
1
PUHY-P750
63 dB<A>
0 Pa
50 ~130 %
20 ~ 250
1 ~ 34
3 Tappinng screw M4
4 pcs.
7 Packing (inside ø29, outside ø39)
1 pc.
A Crossover connecting pipe be-
tween the compressor unit and
heat exchanger unit (liquid side)
1 pc.
(4) When unit is surrounded by walls
Note:
Wall heights "H" of the front and the back sides shall be lower than either
the front or the back panel.
If the panel height is exceeded, add the "h" dimension of the Fig. 5.0.1 to
L
and L
.
1
2
(mm)
L
L
1
2
450
450
Example: When the "h" dimension is 100 mm,
the L
dimension becomes 450 + 100 = 550 mm.
1
the L
dimension becomes 100 + 100 = 200 mm.
2
(5) Collective installation and continuous installation
Space required for collective installation and continuous installation:
When installing several units, provide the space between each block consider-
ing passage for air and people.
and
Open in two directions.
In case of wall height "H" exceeds total height of unit, add "h" dimension (h =
wall height "H'" – total height of unit) to * marked dimension.
If there is a wall at both of the front and the rear of the unit, install up to two sets
(heat exchanger unit and compressor unit: two units each) consecutively in
the side direction and provide a space of 1,000 mm or more for air inlet space/
passage space for each two sets.
PUHY-P800
64 dB<A>
4 Connecting pipe for heat ex-
changer unit (gas side ø28.58)
1 pc.
8 Connecting pipe for indoor unit
(liquid side) <front piping>
1 pc.