Basic Operations; Operation Of The Lcr Meter For The First Time; Unpacking And Inspection; Installation - Protek 9216A User Manual

Digital lcr meter
Table of Contents

Advertisement

Chapter
3

Basic Operations

How the 9216A Operates and What It Can Do
The 9216A LCR meter is very versatile in that the user can customize the
measurement and operating modes to obtain the best results in a particular
situation. In this chapter, the basics of the meter's operation are summarized.

Operation of the LCR Meter For the First Time

Before using 9216A LCR Meter, ensure that it is properly installed, and powered
on.
To get the maximum accuracy for your most critical measurements you
should know how to select the various options and to set up the test conditions
and the proper use of the test fixture you have chosen to use with your meter.

Unpacking and Inspection

After unpacking the 9216A LCR Meter, verify that all parts are included and have
not been damaged during transportation. Retain the packing materials.
Packing Contents:

Installation

To properly install and power on the meter, perform the following steps:
Be sure you have the appropriate operating environment.
Leave a space of at least 5.1 cm (2 in) on each side of the meter for proper
ventilation.
Check the fuse for proper type and rating.
Check for proper electrical connections.
Connect the proper power cord to the power connector on the rear panel.
9216A LCR Meter
Radial Fixture
Power Cord
User Manuals
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents