Unit Assembly Prior To Installation; Nailing Strips; Installation Access Panel - Regency Horizon HZ40E Owners And Installation Manual

Hide thumbs Also See for Horizon HZ40E:
Table of Contents

Advertisement

installation
|
12
UNIT ASSEMBLY PRIOR TO
INSTALLATION
The nailing Strips must be correctly positioned and attached before unit is
slid into position.

NAILING STRIPS

The nailing strips come attached to the unit. There is 1 plate on each side.
The side nailing strips are secured to the framing.
IMPORTANT NOTE
Framing depth measurement is noted with the nailing strips
set as far forward on the irebox as possible. The nailing
strips can be adjusted back up to 3-1/4" to allow for varying
thicknesses in non-combustible material & wall inishes.

INSTALLATION ACCESS PANEL

The unit is equipped with a removable access panel for pre-inish installation
of optional components - this panel is located on the lower front face.
1. Remove 8 screws to remove access panel.
2. Easier access to gas connection with panel removed.
3. Install any optional components with access panel removed.
4. Reinstall access panel with 8 screws - prior to installing any facing material
Note: Access panel is no longer accessible once facing material installed.
Regency Horizon ® HZ40E-10 Gas Fireplace
12 |
Nailing Strips
Installation Access Panel

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hz40e-ng10Hz40e-lp10

Table of Contents