3 Site preparation checklist
3
Site preparation checklist
Introduction
Read the previous chapters in this Site Preparation Guide before completing the checklist.
Complete the checklist in this chapter to make sure that all necessary preparations have
been made for the installation of ImageQuant LAS 500.
Checklist
Requirement
General
If GE support is needed for installation, will the GE
service personnel be required to take site EHS
(Environment, Health and Safety) or security
training before doing the installation?
Assigned personnel
Personnel are assigned as specified.
Site selection
Site complies with requirements for
biosafety
General site requirements are fulfilled
Space requirements
Space is available as specified.
Imager
Accessories/additional components
Environmental requirements
The proper environmental conditions are fulfilled
as specified.
Ambient temperature
Relative humidity
10
YES
NO
N/A
ImageQuant LAS 500 Site Preparation Guide 29-1358-76 AA
Comment/specify