Routine Maintenance - Orved MULTIPLE 315VM P4 Operating And Service Manual

Vacuum chamber packaging machines
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 37
GB
MAINTENANCE
7.4

ROUTINE MAINTENANCE

7.4.1
REPLACING THE SEALING BAR COVER TEFLON BAND
After a long period of use, a black mark starts appearing on the sealing bar cover Teflon band, so it must be replaced.
To do so, proceed as follows:
1) Remove sealing bar (A) from its seat by releasing the two connection wires (B) (Fig. 1).
2) Detach the brown Teflon cover (C) (Fig. 2).
3) Wipe the sealing bar with alcohol (Fig. 3).
4) Fit a new band (Fig. 4), cutting the excess length at the two ends (Fig. 5).
5) Refit the bar in guide (D - Fig. 6) and reconnect the connection wires (Fig. 7).
ATTENTION!
Do not start Teflon band replacement with the sealing bars hot, as there is danger of burns.
B
C
G B
GB
Operation and maintenance manual / Ed. 10 - 2005
A
BLACK MARK
Fig. 1
Fig. 2
D
Fig. 6
NEW
TEFLON BAND
Fig. 4
64
VACUUM CHAMBER
PACKAGING MACHINES
WORN TEFLON
Fig. 3
Fig. 5
Fig. 7
REV. 00 - Cod.: 1500154

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multiple 315vm p8Vm18Vm12Vm16Vm18 hVm53 h ... Show all

Table of Contents

Save PDF