2-6
Checking the Serverboard Setup
After you install the server in the rack, open the unit to make sure the serverboard
is properly installed and all the connections have been made.
Accessing the Inside of the System
Before operating the server for the first time, it is important to remove the protec-
tive film covering the top of the chassis, in order to allow for proper ventilation and
cooling.
Removing the Chassis Cover and Protective Film (Figure 2-5)
1. Unplug the AC power cord from any external power source.
2. Remove the two screws which secure the top cover onto the chassis.
3. Lift the top cover up and off the chassis.
Figure 2-5. Accessing the Inside of the System
1
3
1
1
Remove two
1
screws
2-9
Chapter 2: Server Installation
2
Check Ventilation
Openings
1
4