Table of Contents

Advertisement

Index

1
1/4 hook and loop cabling strap kit 64, 66
100 kilo sliding shelf kit 12
A
about this guide 7
adjusting the air duct 21
air duct kit 18
assembling the air ducts 18
B
before you contact HP 103
C
Cable management bracket kit 32
cable management tray 40
cable management tray, installing 41
custom door branding kit 30
D
documentation feedback 106
F
filler panel kit 59
front door kit 46
front mount 35
G
ground bonding kit 49
ground bonding stud location 45
H
heavy duty stabilizer kit 61
hook 66
HP contact information 103
I
installing foam rail gaskets between racks 24
installing the 1U cable management bracket 33
installing the 2U cable management bracket 34
installing the air duct assembly 22
installing the baying kit 82
installing the cable management D-ring bracket 34
installing the cross-over bracket 36
installing the custom door branding kit 30
installing the filler panel 59
installing the floor gasket 26
installing the front door 48
installing the ground bonding rack option kit on fan
kits 57
installing the ground bonding rack option kit on side
panels 55
installing the hinge brackets and lock catches 47
installing the hook-and-loop cabling strap clips 64,
67
installing the server/utility shelf 88
installing the side panels 93
installing the sliding shelf 15
installing the sliding shelf rail assemblies 13
installing the stabilizer rack option kit 61, 95
L
LED light 70, 71
Location Discovery 77, 80
O
offset baying rack option kit 81
P
preparing the sliding shelf rail assemblies for
installation 12
R
Rack Airflow Kit 24
rack options 9
rack tie-down option kit 98
regulatory information 104
required tools, 1/4 hook and loop cabling strap
kit 24
required tools, front door kit 46
Index 107

Advertisement

Table of Contents
loading

Table of Contents