CAME F1024 Installation Manual
CAME F1024 Installation Manual

CAME F1024 Installation Manual

Automation for swing gates
Hide thumbs Also See for F1024:

Advertisement

Quick Links

AUTOMATION FOR SWING GATES
FERNI
SERIES
INSTALLATION MANUAL
F1024

Advertisement

Table of Contents
loading

Summary of Contents for CAME F1024

  • Page 1 AUTOMATION FOR SWING GATES FERNI SERIES INSTALLATION MANUAL F1024...
  • Page 2: Legend Of Symbols

    Gate leaf weight (kg) 3 Reference Standards The company: CAME cancelli automatici is ISO 9001:2000 quality certified; is has also obtained the ISO 14001 environmental safeguarding certification. CAME engineers and manufactures all of its products in Italy. This product complies with the following standards: see declaration of compliance.
  • Page 3: Overall Dimensions

    4.4 Overall dimensions Measurements in mm 5 Installation Installation must be carried out by expert qualified personnel and in full compliance with current regulations. 5.1 Preliminary checks Before installing, do the following: • Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving parts; •...
  • Page 4: Tools And Materials

    5.2 Tools and materials Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and compliance with the current standards and regulations. The following figure illustrates the minimum equipment needed by the installer. 5.3 Cable list and minimum thickness Connections Type of cable...
  • Page 5 5.5 Mounting - secure the base plate to the pillar using ø8 screws and ø14 moulded inserts making sure the minimum distance of 150mm from the ground is met. - Secure the A bracket (using ø8 screws or by welding) to the gate leaf making sure the 450mm and 19mm distances measu- rements and are met.
  • Page 6 - Insert the straight semi-arm into the motor shaft. Apply the fl ared washer, the M6x20 screw and lock the semi-arm using the two grub screws. Join and secure the two arms using the washer and M8x16 screw. Release the motor (see p. 7) and secure the curved semi-arm to the “A”...
  • Page 7 Lower cam When performing the next, required, electronic adjustment of the closing space, please consult the technical documentation of the installed CAME control panel. Once fi nished with mounting, electrical connections and adju- stments, lock the motor back into place and replace the cover securing it with the 4 issued screws.
  • Page 8: Safety Instructions

    5.9 Connecting to the ZL19N control panel Motor terminals Control panel terminal board ZL19N M -N F -Fa R -Rc Connecting the motor Opening endstop microswitch Closing-speed brake microswitch 6 Safety instructions Important safety instructions This product must only be employed for its originally intended use. Any other use is wrong and potentially dangerous. The manufacturer cannot be held liable for any damages resulting from wrongful, erroneous or negligent uses.
  • Page 9: Maintenance

    7 Maintenance 7.1 Maintenance Periodic maintenance to be carried out by the end-user is as follows: wipe clean the glass surface of the photocells; check that the safety devices work properly; remove any obstructions. We suggest checking the state of lubrication and tightness of the anchoring screws on the operator. To check the efficiency of the safety devices, move an object in front of the photocells when gate is closing.
  • Page 10: Extraordinary Maintenance

    Periodic maintenance log for end-user (every 6 moths) Signature Date Notes 7.3 Extra-ordinary maintenance The following table serves to note down any extraordinary maintenance, repairs or improvements performed by specia- lised firms. N.B.: Any extraordinary maintenance must be performed by specialised technicians. Extra-ordinary maintenance log Installer’s stamp Operator name...
  • Page 11: Phasing Out And Disposal

    We ask you to keep protecting the environment, as CAME deems it to be one of the fundamental points of its market operations strategies, by simply following these brief guidelines when disposing: DISPOSING THE PACKING MATERIALS The packing components (cardboard, plastic, etc.) are solid urban waste and may be disposed of without any particular difficulty,...
  • Page 12 CAME UNITED KINGDOM LTD UNIT 3, ORCHARD BUSINESS PARK TOWN STREET, SANDIACRE NOTTINGHAM - NG10 5BP - U.K. Tel - 0044 115 9210430 Fax - 0044 115 9210431...

Table of Contents