Rotating The Display; Steam Or Compressed Gas Applications; Flanged Type Connections To Ansi B16.5 (Schedule 40) - Onicon Vortex Flow Meter F-2200 Series Installation And Operation Manual

Flow meter
Table of Contents

Advertisement

3.2.1.2 Rotating the display

To rotate the display, fi rst unscrew the cover using the special tool provided for this
purpose. Once the cover is removed, the (4) Philips head screws that secure the
display are exposed. To rotate the display, remove these screws and carefully move it
to the desired position making certain that the interconnecting cable is not damaged
in the process.
Do not remove enclosure covers in any wet environment
!
Keep dirt and debris out of electronics enclosure
Keep threads lubricated (silicone based lubricant)
Do not over tighten covers. Use special tool for removal only.
3.2.2 Flanged-Type Connection To Ansi B16.5 (Schedule 40)
Meter sizes
3/8", 1/2", 3/4", 1", 1 1/2", 2", 3", 4", 6", 8"
Pipe fl anges
To ANSI: #300 standard,
Gaskets are supplied with fl anged units.
Center the fl ow meter by sight.
Check the fl ange connections for leak-tightness
after the fl ow meter installation.
F-2200 Series Vortex Flow Meter Installation and Operation Guide • Revised 12/08
#600 optional
16
CAUTION

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Vortex Flow Meter F-2200 Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents