Dodge RAM 1500 1998 Owner's Manual page 2006

Table of Contents

Advertisement

DR
VALVE BODY (Continued)
(5) Install lower housing on assembled transfer
plate and upper housing (Fig. 314).
(6) Install and start all valve body screws by hand
except for the screws to hold the boost valve tube
brace. Save those screws for later installation. Then
tighten screws evenly to 4 N·m (35 in. lbs.) torque.
Start at center and work out to sides when tighten-
ing screws (Fig. 314).
UPPER HOUSING VALVE AND PLUG
Refer to (Fig. 315), (Fig. 316) and (Fig. 317) to per-
form the following steps.
(1) Lubricate valves, plugs, springs with clean
transmission fluid.
(2) Assemble regulator valve line pressure sleeve,
throttle plug and spring. Insert assembly in upper
housing and install cover plate. Tighten cover plate
screws to 4 N·m (35 in. lbs.) torque.
(3) Install 1-2 and 2-3 shift valves and springs.
(4) Install 1-2 shift control valve and spring.
1 - SPRING
2 - RETAINER
3 - BOOST VALVE
4 - BOOST VALVE PLUG
5 - SPRING GUIDES
6 - E-CLIP
7 - SHUTTLE VALVE SECONDARY SPRING
Fig. 315 Shuttle and Boost Valve Locations
AUTOMATIC TRANSMISSION - 48RE
Fig. 314 Installing Lower Housing On Transfer Plate
And Upper Housing
1 - VALVE BODY SCREWS (13)
2 - LOWER HOUSING
3 - UPPER HOUSING
4 - TRANSFER PLATE
8 - SHUTTLE VALVE COVER
9 - SHUTTLE VALVE
10 - SHUTTLE VALVE PRIMARY SPRING
11 - GOVERNOR PLUG COVER
12 - THROTTLE PLUG
13 - UPPER HOUSING
14 - BOOST VALVE COVER
21 - 303

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1997 ram 1500

Table of Contents