Download Print this page

PEUGEOT Speedfight 2 Owner's Manual page 158

Hide thumbs Also See for Speedfight 2:

Advertisement

Index
REFOP
Note: References throughout this index are in the form
-
"Chapter number" "Page number"
Air filter
-
1. 2 6
Air filter housing
-
4 . 5
Alternator
-
9 . 1 7,901 8
Battery
-
1*26,9.3,9.4
Battery access panel
-
7 . 3
Belly panel(s)
Speedfight
-
7 . 6
Trekker- 7 . 1 0
Vivacity
-
7 . 1 3
Belt (drive)
-
1.34,2C.2,2C.7
Bleeding
disc brake
-
8 . 5
oil pump
-
2A. 9
Body panels
Speedfight
-
7 . 4
Trekker- 7 . 9
Vivacity
-
7 . 1 2
Brake (disc
type)
bleeding
-
8 . 5
caliper
-
8. 3 , 8 . 4
.
checks
-
1.26
disc
-
8 . 3 ,
8 . 4
fault finding
-
REF08
fluid change
-
8 . 6
fluid level check
-
0.13, 1.27
levers
-
1026,807
master cylinder
-
8 . 4
hose
-
1027,805
pads
-
1.27,8*2,8.4
Brake (drum type)
cable
-
1027,807
cam check and lubrication
-
1. 3 4
checks
-
1. 2 6
fault finding
-
REF08
inspection and shoe renewal
-
1.28.8.6
levers
-
1.26.8.7
Brake light
bulb
-
9 . 7
check
-
1033,905
switches
-
9 . 7
Bulbs
headlight
-
9 . 5
instrument lights
-
9 . 1 1
licence plate light
-
9 . 8
ratings
-
9 . 2
sidelight
-
9 . 6
taillbrake light
-
9 . 7
turn signal
-
9 . 9
Cables
oil pump
-
1.29,1.30
rear drum brake
-
1027,807
speedometer
-
9 . 1 1
throttle
-
1.28,4.1
0
Caliper (disc brake)
-
8 . 2 ,
8 . 4
Carburettor
cleaning
-
1. 3 1
disassekbly, cleaning and inspection
-
4 . 7
heater
-
4 . 1 2
overhaul
-
4 . 5
reassembly
-
4 . 1 0
removal and installation
-
4 . 6
specifications
-
3 . 1
CDI unit
-
5 . 4
Charging system
-
9. 1 7
Choke mechanism
-
4 . 5
Clutch and clutch pulley
check and lubrication
-
1. 3 4
removal, inspection and installation
-
2 C . 7
Coolant
level check
-
0 . 1 2
reservoir
-
3 . 4
type
-
3 . 1
Cooling fan
-
2 A . 8
Cooling system
check
-
1 . 3 2
draining, flushing and refilling
-
3 . 2
hoses
-
3 . 5
specifications
-
3 . 1
radiator
-
3 . 4
temperature gauge and sender
-
3 . 3
thermostat
-
3 . 4
water pump
-
3 . 5
Conversion factors
-
REF4
Crankcases, crankshaft and connecting rod
-
2A*11,2B*6
Cylinder
-
2A.5,20.5
Cylinder head
decarbonisation
-
1 . 3 3
removal, inspection and installation
-
2A*4,2B*4
Decarbonisation
-
1 033
Dimensions
-
1 *2 to 1 024
Disc (brake)
-
803,804
Drive belt
-
1.34,2C.7
Drive belt cover
-
2 C . 2

Advertisement

loading