Access Control; Power-On Sequence - ABB REF601 Applications Manual

Feeder protection and control/feeder protection
Hide thumbs Also See for REF601:
Table of Contents

Advertisement

Section 2
REF601/REJ601 overview
2.4.5
2.4.6
12

Access Control

To protect the relay from unauthorized access and to maintain the integrity of
information, the relay is armed with a three level, role-based user authentication
system with individual password for the operator, engineer (Setting level) and
administrator level. The password is a combination of different navigation keys.

Power-ON sequence

The Power-ON sequence takes around 6 sec.
In case the optional communication on MODBUS is present, the startup time takes
around 40 sec.
1MDU07212-YN Rev. A
REF601 / REJ601
Application Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rej601

Table of Contents