Practical example of RCD test with distribution leads.

10.2 Principles of Uc Measurement

Ground being imperfect in the Fig35, when R exists, when a fault current flows to R, electric
potential occurs. There is a possibility the person contacting in this imperfect ground, it calls
the voltage, which it occurs in the human body of this time, called Uc.
When with the Uc Test letting flow IΔN to the RCD, the Uc is calculated.
Uc voltage is calculated based on the Rated Residual Current (IΔN) with the impedance
measured.

10.3 Operating Instructions for RCD

10.3.1 Initial Checks: to be carried out before any testing;
1. Preparation
Always inspect your test instrument and lead accessories for abnormality or damage:
If abnormal conditions exist DO NOT PROCEED WITH TESTING. Have the instrument
checked by your distributor.
Operation of Function Switch
ms
L-PE
× 1
2
230V
50.0Hz
30 mA
UL50
V
L-PE
L-N
: 0°
!
Fig.38
1. Operate the Power button and turn on the instrument.
Turn the rotary switch and select the RCD function.
ms
L-PE
×1
230V
50.0Hz
30 mA
UL50
V
L-P E
L-N
: 0 °
!
Fig.37
F1
Measurement mode setting
(X1/2, X1, X5, Ramp, Auto,Uc)
F2
IΔn setting
F3
RCD Type setting (
F4
PHASE setting (0
PE
,
,
,
S
o
o
,180
)
39
)
S