Midea MTA1-76HR Technical Manual page 30

Table of Contents

Advertisement

MCAC-RTSM-201301-01
1 unit should be fixed 4 screws which match with M12 foundation bolts.
The distance of the foundation bolt is shown in following figure.
Snow protection facilities must be installed in the snowfall areas. If the snow protection facilities are
incomplete, faults may occur. In order to prevent influence caused by snow, set up raised pavilion,
and install sheds at the air inlet and aire outlet.
Notes:
It is dangers that the outdoor unit is fixed by mouting on the wall.
Midea R22 T1 side-discharge duct manual
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents