8. Turn on the power to all the computers.
Note: The Power On sequence requires that all Second Stage units be
powered on first. After all the Second Stage units have been
powered on, then the First Stage unit must be powered on next. After
the Second and First stage units have been powered on, the
computers can be powered on.
Two Stage Installation Diagram
USB DVI
KVM Cable Set
Chapter 2. Hardware Setup
19