Keysight n1921a Operating And Service Manual page 36

P-series wideband power sensor
Hide thumbs Also See for n1921a:
Table of Contents

Advertisement

2
Performance Tests and Adjustments
Figure 2-7
5 Download the Wideband Power Sensor Zero Set Verification Utility from the
6 Go through the readme file.
7 Establish a GPIB connection between the signal generator, power meter, and
8 Download and install Keysight VEE Pro Runtime 9.0 or above.
9 The power meter (N1911/2A) and the signal generator (E4438C) must be
10 Run the Wideband Power Sensor Zero Set Verification Utility.
36
Zero set performance test in system level setup
E4438C
link below.
http://www.keysight.com/main/
redirector.jspx?action=ref&cname=EDITORIAL&ckey=1956605&lc=eng&cc=US
&nfr=-536902922.536894476
the PC by using the USB/GPIB interface and a GPIB cable.
added to the Instrument Manager.
Go to Start > Program > Keysight VEE Pro 9.0 or above Runtime Config > IO
Configuration. Select Find to find the connected instrument and Save to save
the configuration.
Keysight N1921A and N1922A Operating and Service Guide
DUT
Power meter

Advertisement

Table of Contents
loading

This manual is also suitable for:

N1922aP seriesN1921a

Table of Contents