Panasonic PAW560MAH2L Installation Instructions Manual page 70

Air handling unit kit
Table of Contents

Advertisement

Control
TERMINAL
M1.1 M1.2 M1.3 M1.4 M1.5
M1.6 M2.1 M2.2 M2.3 M2.4 M2.5
1 2
3 4 5 6
1 2
PMV
HBS
(WHT)
(YEL)
(RED)
(WHT)
HU1
OPTION
1 2
1 3
1 2
3 4 5 6
HU1 HU2
ON1 ON2 ON3 ON4 ON5 ON6
70
7. Restore and fasten the upper mounting board in its original position, and close the AHU Kit
enclosure again (see "4.1 Installation of AHU Kit" – step 5).
Case 3: 0–10 V demand control by an external BMS
To set the thermostat for 0–10 V demand control by an external building management system
(BMS), perfom the following steps:
1. Open the AHU Kit enclosure (see "4.1 Installation of AHU Kit" – step 2), and remove the up-
per mounting board.
2. On the CZ-CAPBC2 PCB, located on the lower mounting board inside the AHU Kit en-
closure, remove the existing wiring from the thermostat TR-16 at the analogue input (AI)
contacts No. 3 and 4, and replace it with the 0–10 V signal wiring from the external BMS
(see diagram below). Make sure that correct polarity is observed: terminal 3 = negative (–),
terminal 4 = positive (+).
TERMINAL
COM DI1 DI2 DI3 COM DO2 COM DO1
+
1
2
3
4
+
E
1
ORG
2
RED
3
YEL
T10
(YEL)
4
BLK
GRY
5
6
WHT
Connect 0–10 V signal wiring from
BMS here (observing correct polarity!)
BRN
ORG
YEL
BLU
COM DO2 COM DO1
CN2
CZ-CAPBC2
5
6
7
8
9
10
11
12
8
9
10
PK1-B
PAW-T10
1
1
2
2
3
4POL
T10
3
4
(WHT)
4
5
6
PK1-A
7 6 5
-
+
13
14
15
CN1
5
4
3
2
1
TR-16
10
9
8
7
6
Disconnect the
wiring of the
TERMINAL
TR-16 controller
PT10 PT9 PT8
PT100

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Paw560mah2Paw280pah2lPaw280pah2Paw280mah2lPaw280mah2

Table of Contents