Installing The Support Rails; Rear Rack Mounting Template - IBM totalstorage fastt100 Installation, User And Maintenance Manual

Storage server
Table of Contents

Advertisement

3 U
0 U
Figure 8. Rear rack mounting template

Installing the support rails

Before installing the FAStT100 in a rack, you must install the rails and
rack-mounting hardware that come with your storage server. The FAStT100 requires
an Electronic Industries Association (EIA) 310-D Type A 19-inch rack cabinet. The
distance between EIA rails, from the front to the rear of the rack, is 60.96 cm (24
in.) minimum and 81.28 cm (32 in.) maximum. This rack conforms to the EIA
standard. Where you place the support rails in the rack depends on where you
intend to position the storage server.
Complete the following steps to install the support rails:
Note: Refer to Figure 10 on page 20 while performing these steps.
18
IBM TotalStorage FAStT100 Storage Server: Installation, User's, and Maintenance Guide
2 U
1 U
Rail assembly
(
Rear Left
1. Ensure that the rack has already been installed.
2. Ensure that a stabilizer has been correctly attached to the bottom front of the
rack to prevent the rack from tipping forward while the FAStT100 is being
installed.
Refer to the installation and service guide, or equivalent, for the rack as
required.
3. Locate the two support rails and six of the eight M6 screws that are supplied
with the FAStT100.
FAStT100
REAR
Rack Mounting
Template
)
Printed in the U.S.A.
Rail assembly
(
Rear Right
)
®
3 U
2 U
1 U
0 U

Advertisement

Table of Contents
loading

Table of Contents