Commissioning
16.1 Commissioning Guide
Initial startup
When your OP arrives, it contains firmware but not a configuration. This
software, which is essential for operating the OP, has to be loaded for initial
startup.
To do this, proceed as follows:
1. Connect interface IF1 of the OP by means of a suitable standard cable to
2. Switch on the power supply of the OP. Since you have still not loaded a
3. Start the download operation to the OP on the PC or PU. The OPchecks
Note
Refer to the ProTool/Lite Configuration Manual for a detailed account of the
procedure.
Once the configuration has been successfully downloaded, the OP runs up
again and displays the standby message.
Restarting
If you wish to replace a configuration on the OP with another one, proceed as
follows:
1. Connect interface IF1 of the OP by means of a suitable standard cable to
2. Switch on the power supply of the OP.
3. Call the standard screen System
If this standard screen is not available in your configuration, press – while
switching on the power supply – the following three keys
16-2
the configuration computer (PC or programming unit).
configuration, the OP automatically switches to Download mode with the
message "Ready for Transfer" and waits for the data to be down-
loaded from the PC or PU. You cannot operate the OP in this mode.
the link to the PC or PU. If a link is not available or if it not functioning
properly, the OP issues a corresponding error message. If the link is in
order, downloading of the configuration from the PC or PU is initiated to
the OP.
the configuration computer (PC or programming unit).
Download mode on the OP. Before you do so, enter the password for the
password level concerned, if required.
OPMode
Download to switch to
Manual OP5, OP15
( ) J31069-D0840-U001-A2-7618

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Op15

Table of Contents