Electrical Installation
Electrical
The OP requires the following electrical connections
connections
The electrical connection to the configuration computer is required to down-
load the configuration to the OP.
The basis for interference-free operation is interference-proof hardware de-
sign of the PLC in accordance with EMC guidelines and the use of interfer-
ence-proof cables.
Caution
!
Assemblies may be changed only by suitably qualified persons who must be
completely familiar with all the warning notices and steps of this manual.
Manual OP5, OP15
( ) J31069-D0840-U001-A2-7618
to the power supply,
to the configuring computer (PC or programming unit),
to the PLC.