Commissioning
Diagrammatic
Figure 16-1 shows the most important steps for initial startup, restart and nor-
representation
mal operation of the OP. The commissioning guide which follows explains
the different steps that have to be taken to commission the OP.
Initial startup
Neither configuration nor
firmware on the OP.
Download configuration data to OP
ProTool/
Lite
COM1/2
Figure 16-1 Diagram of Commissioning
Manual OP5, OP15
( ) J31069-D0840-U001-A2-7618
Restart
The OP already has a config-
uration but is required to
work with a modified or new
configuration.
Switch on OP power supply
Set Download mode by means of the
standard screen
System
OPMode
Download
OP
IF1
Message level
16
Normal operation
The OP is operated
with the loaded
configuration.