Installing The Handle Retainers; Installing The Battery Pack - Toro 04042 Operator's Manual

Traction unit
Hide thumbs Also See for 04042:
Table of Contents

Advertisement

Figure 5
1. Transmission coupling
4. Maneuver the traction unit frame (Figure 6) forward
until it engages the cutting unit pivot arms.
3
2
1
G017242
Figure 6
Battery platform not shown.
1. Telescoping coupler
5. Secure the traction unit frame to the cutting unit pivot
arms with 2 bolts (3/8 x 3/4 inch) (Figure 6).
Note: To remove the cutting unit, just loosen the 2
bolts (3/8 x 3/4 inch) approximately 1-1/2 turns and
rotate the pivot arms out.
6. Push down on the kick stand to release the spring
loaded locking pin and allow the kick stand to rotate
up to the storage position.
7. Set the height-of-cut of the reel as described in the reel
Operator's Manual.
2. Cutting unit hex shaft
3

Installing the Handle Retainers

Parts needed for this procedure:
2
Handle retainer
2
Hair pin cotter
Procedure
1. While supporting the handle, remove the cable ties
securing the handle clamps to the side plates (Figure 7).
g017355
1. Hair pin cotter
2. Pivot the handle to the desired operating position,
insert a handle retainer over the handle clamp and into
the matching holes in the side plate (Figure 7).
3. Secure the clamp in position with a hair pin cotter
(Figure 7).
4. Repeat the procedure on the opposite side of the
handle.
5. Adjust the handle height to the desired position; refer
to Adjusting the Handle Height (page 21).
Note: The machine is shipped with the handle
adjusted to the lowest position. The machine is
traditionally operated with the handle telescoped out to
its maximum height.
12
2
Figure 7
2. Handle retainer
1