Issue
Service Manual
Rev.
Model No: 26A SERIES
6-8 base assembly
Instruction:
1) All the tubes can be welded together
to be a heat pump system;
2) Every part in the base assembly can
be applied as spareparts;
3) The refrigerant charged is R134A.
4) The system air pressure should be
less than 15Pa before charging R134A;
5) The refrigerant amount charged should
e 630g. The tolerence is 2g.
6) You should check if the gas is leaking
after charging the refrigerant with special
equipment;
7) All the service people assembling
the base should have the license.
-25 -