Congratulations on your new product Congratulations on your new product You have just bought a CTC EcoZenith i250, which we hope you will be very pleased with. In the following pages you can read about how to operate and maintain your boiler.
Page 6
It comes with a room sensor as standard, which is equipped with an LED which flashes in the event of a fault. If you want to supplement your CTC EcoZenith i250 with other heating, you can do this easily thanks to two unique connections. We have decided to call this option Energyflex.
• Following installation, the unit must be inspected, functional checks performed and the customer informed. The points below should be checked off. Pipe installation CTC EcoZenith i250 filled, positioned and adjusted in the correct manner according to the instructions. CTC EcoZenith i250 positioned so that it can be serviced.
• Children should be supervised to ensure that they do not play with the appliance. CTC EcoZenith i250...
Page 9
Complete the fields below. This information is useful if any servicing work is required Product : Manufacturing number: Product : Manufacturing number: Installation company Tel. no. Date Name Electrical installation company Tel. no. Date Name No liability is accepted for any misprints or changes. CTC EcoZenith i250...
Installer/Settings/Radiator system menu. Recommended values are: Floor heating only Inclination 35 Low temperature system (well insulated houses) Inclination 40 Normal temperature system (factory setting) Inclination 50 High temperature system (older houses, small radiators, poorly insulated) Inclination 60 CTC EcoZenith i250...
Page 11
You then need to adjust the heating curve, as necessary, following the method shown above. When the basic values have been set more or less correctly, the curve can be finely adjusted directly using the Room temp. shown on the home menu screen. CTC EcoZenith i250...
Page 12
Inclination 60 °C Adjustment 0 °C In this example, the maximum outgoing primary flow temperature is set at 55 °C. The minimum permitted primary flow temperature is 27 °C (e.g. summer-time basement heating or the floor circuits in a bathroom). Outside Temperature CTC EcoZenith i250...
Page 13
Off means that the heating is switched off. For systems with a radiator pump, the radiator pump is switched off. - No selection means no function when activated. CTC EcoZenith i250...
General Information 2. Technical data Table 400V 3N~ Electrical Data CTC EcoZenith i250 H CTC EcoZenith i250 L Electrical data 400V 3N~ 50Hz Rated power 15.04 15.04 Immersion heater (steps of 0,3 kW) 0 - 15.0 Max immersion heater output...
Page 15
General Information 2.2 Table 230 V 1N~ CTC EcoZenith i250 H CTC EcoZenith i250 L Electrical Data Electrical data 230V 1N~ 50 Hz Rated power 12,04 12,04 Immersion heater (steps: 3, 5, 7, 9, 12 kW) 0-12 IP class IPX1...
General Information 4. CTC EcoZenith i250 design The picture below shows the basic construction of CTC EcoZenith i250. If a heat pump is connected, the energy in the air or bedrock/ground is drawn up by the cooling system. The compressor then increases the temperature Heat pump pipes to a usable level.
Boiler lower kW Delay mixing valve Main fuse A Input voltage 3x400 V Tariff EL Upper tank Factory User (set) value value Stop temp. HP ºC Max. Start/stop diff. upper ºC Max. time upper tank Max. time lower tank CTC EcoZenith i250...
Condense pipe secured Factory values Room temp. cooling 25.0 Room temp. The CTC EcoZenith i250 is delivered with set factory Smart: Low price. ºC Weekly schedule Smart: Over capacity. ºC values which are suitable for a standard house with Heating circuit 1 a standard radiator system.
Page 21
Diff func. Pump / ºC On 32 Pool ºC Off 22(20) Pool ºC Off 22(20) Heating circuit Installer settings menu Heating circuit Installer Operation data heating CTC EcoZenith i250 T ºC Operation data heating Room1 Prim1 Return Room2 Prim2 T ºC Time/Language Settings...
Page 22
Installer Sunday 10 - 12 20 - 23 H-tank (B6) ºC Suomi Française Dansk Norsk Settings Cooling CTC EcoZenith i250 Settings language Settings Common heating/cooling Heating circuit 1 Condense pipe secured EcoZenith Operation data Heating circuit 2 Room temp. cooling 25.0...
Page 23
None Function test Service Heating circuit Heat pump Function test Valves Alarm log Electric heater Factory settings coded Solar Quick start compressor. Diff thermostat function Software update, USB Pool Write log to USB Control current sensors Re-installation CTC EcoZenith i250...
Page 24
Charge start diff temp ºC Dansk Heating circuit 1 Charge stop diff temp ºC Room sensor 1 Charge temperature °C Type Wireless Action Disconnect Eesti Status Associated Level of signal Battery Version x0102 CTC EcoZenith i250 Test Diff thermostat function...
Page 25
Solar Quick start compressor. Quick start compressor. Diff thermostat function Diff thermostat function Software update, USB Software update, USB Pool Pool Write log to USB Write log to USB Control current sensors Control current sensors Re-installation Re-installation CTC EcoZenith i250...
The heating system’s structure can be temperature. adjusted/modified using this option. Home Service The Home button takes you back to the Start Advanced settings are configured by the menu. appropriate technical person. Installer settings menu Installer CTC EcoZenith i250 Time/Language Settings Define system Service...
Compressor Permitted Heat pump Stop at outdoorºC Flow/level firing process. The CTC EcoZenith i250 then provides Brine pump on Auto Tariff HP heating to the radiators using the set heating curve. The Test Diff thermostat function...
Status HP upper tank Thursday 08 - -- -- - 21 ormal Tank upper °C 49 (58) Operation data system CTC EcoZenith i250 Friday 08 - -- -- - 21 Tank lower °C 42 (45) Saturday 10 - 12 20 - 23 Electric power kW 0.0+2.5...
You set the values for this option which apply to the Diff func. Pump / ºC On 32 Pool ºC Off 22(20) CTC EcoZenith i250’s normal operation. There are three Heating circuit 1 Weekly schedule Weekly program modes: Heating circuit Economic –...
-- - 21 The timer comes on from 06–21 on Thursdays. Operation data heating T ºC taller settings menu Installer Room1 Prim1 Return Room2 Prim2 ime/Language Settings Define system Service Software display PCB: 20120205 Software HP PCB: 01234 CTC EcoZenith i250...
Installer settings menu temperature. Installer Operation data system Return radiators The return temperature of the radiator water returning to EcoZenith is also shown above the CTC EcoZenith i250 (34°C). This value will vary during operation according to Time/Language Settings Define system Service the parameters set, the radiator system’s capacity and...
42 (45) This menu displays current temperatures and the Electric power kW 0.0+2.5 Stored oper data operational data for your EcoZenith i250. The first figure Current L1/L2/L3 0.0 0.0 0.0 Diff func. Pump / ºC On 32 is the actual operational value, with the value in brackets Pool ºC...
Mixing valve 2 outdoor temperature. Deutsc Return flow °C Shows the temperature of the water returning from the radiator system to the CTC EcoZenith i250. Settings Radiator pump Def heating circuit 1 Sett. Diff termostat function Shows the radiator pump’s operational status.
22 - 24 This menu shows the operating values for the Electric Heating kWh sday 00 - 06 22 - 24 Compressor: CTC EcoZenith i250 over a long period. dnesday 00 - 06 22 - 24 rsday 00 - 06 22 - 24...
Pool (G50, G51, B50) The red and grey curves are primary flow temperatures Remote control None 1 and 2, respectively. Software display PCB: 20120205 Software HP PCB: The yellow curve is the CTC EcoZenith i250 return 01234 Room1 Prim1 Return Room2 Prim2 temperature.
5°C. Re-installation Switching between heating and summer mode can be controlled remotely. Specify here what is to happen with remote control. Find out more in the section entitled “Define/Remote control”. CTC EcoZenith i250...
Page 38
When the room temperature is too low, the message “Low room temperature alarm” is sent to CTC SMS. The room sensor must be connected and activated. NB: For more information on the SMS function, see the “CTC SMS” manual. CTC EcoZenith i250...
Page 39
No means that the heat pump will always follow the Electric heater Factory settings coded temperature of the radiators. Solar Quick start compressor. Diff thermostat function Software update, USB Pool Write log to USB Control current sensors Re-installation CTC EcoZenith i250...
Smart block HP No (No/Yes) This is used when a dual tariff is used with lower energy costs at set hours of the day. Find out more in section entitled Define/Remote control/Smart Grid CTC EcoZenith i250...
Smart lo Smart: Low price. ºC Smart o The temperature of the boiler when CTC EcoZenith i250 Smart: Over capacity. ºC calls for assistance to reach the high temperature; the immersion heater then works up to this value after the set time delay on the mixing valve.
Upper tank Pool diff ºC Max time upper tank Lower tank Pool priority Max time lower tank Compresso Smart low price. ºC Smart: Low price. ºC Expansion Smart over capcity. ºC Smart: Over capacity. ºC Log compr Cooling CTC EcoZenith i250...
Electric he Compressor Permitted Heat pump Electric he Stop at outdoorºC Flow/level switch None Electric he Brine pump on Auto Electric he Tariff HP Electric he Minimum run time CTC EcoZenith i250 Smart block HP Electric he Electric he...
3x400 V Activate Heating circuit 1 Tariff EL Level of signal Smart block immersion Phone Number 1 +46712345678 Smart block mixing valve Phone Number 2 ----------------- CTC EcoZenith i250 Hardware Version Cooling Software Version Upper tank Fact Settings Pool Night reduc...
Cooling is adjusted using primary flow sensor 2 (B2), which means that radiator system 2 and cooling cannot be used simultaneously. Cooling No (No/Yes) This is for selecting whether cooling is installed. NOTE: See CTC EcoComfort manual for more information. CTC EcoZenith i250...
Operation data. 8.8.7 Def. Pool Specify here whether pools are used. This function will only work if an expansion card is connected to the product. See the CTC Solar controls/Expansion card manual for more information. CTC EcoZenith i250...
*The number of heating systems varies between different products. The maximum is four heating systems. NB: Enertech AB is NOT responsible for the required heat being produced if the remote control has blocked the heating over a long period. CTC EcoZenith i250...
Pump EH Pump be Valve ch NB: Enertech AB is NOT responsible for the required heat being produced if the remote control has blocked the heating over a long period. Valve tan Power o Energy o Energi k CTC EcoZenith i250...
Page 51
NB: Enertech AB is NOT responsible for the required heat being produced if the remote control has blocked the heating over a long period. Valve tank (Y30) EHS-tank Power output kW Energy output / 24 kWh 12.3 Energi kWh CTC EcoZenith i250...
Page 52
Installer/Settings/Upper tank/Extra DHW stop temp ºC menu Installer/Settings/DHW tank/Extra DHW stop temp ºC. NB: Enertech AB is NOT responsible for the required heat being produced if the remote control has blocked the heating over a long period. CTC EcoZenith i250...
Page 53
*The number of heating systems varies from product to product. The maximum is four heating systems. NB: Enertech AB is NOT responsible for the required heat being produced if the remote control has blocked the heating over a long period. CTC EcoZenith i250...
Page 54
NB: Enertech AB is NOT responsible for the required heat being produced if the remote control has blocked the heating over a long period. Prioritize charging EHS-tank Flow l/min Panel protection Test DHW CTC EcoZenith i250 Over temp protection panel Tap water pump (G5) 100% Status: -Max panel temp °C...
Page 55
*** Valid for CTC EcoLogic PRO/Family NB: Enertech AB is NOT responsible for the required heat being produced if the remote control has blocked the heating over a long period. Def. Solpaneler Operation solar panels CTC EcoZenith i250 Status: Heating Charging EHS-tank Solar panels used Solarpanel In/Out °C...
Page 56
If demand falls and the mixing valve closes, it may not open more than 50%. NB: Enertech AB is NOT responsible for the required heat being produced if the remote control has blocked the heating over a long period. CTC EcoZenith i250...
Page 57
• Cooling. Room temperature is reduced by 2ºC (Factory setting, Smart overcap. ºC) (EcoZenith 550; Heating System 2 is not affected) NB: Enertech AB is NOT responsible for the required heat being produced if the remote control has blocked the heating over a long period. CTC EcoZenith i250...
The fan or brine pump and charge Heating Cable 4-way valve(Y11) pump are also operating so that the compressor is not going to trigger its pressure switches. Test valves Installer 3-way valve Down Save settings CTC EcoZenith i250 Save settings Load factory settings...
Page 59
Log compressor stop Phone Number 2 ----------------- Compressor operation Smart low price. ºC Cooling Cooling 20.2 (20.0) Hardware Version Expansion valve Smart over capcity. ºC Software Version Log compressor stop Cooling Night reduction Holiday CTC EcoZenith i250 Operation data system...
Lower tank Pool priority you can also take a look without any code to see what Compressor operation Smart low price. ºC Expansion valve Smart over capcity. ºC options feature in the menu. Log compressor stop Cooling CTC EcoZenith i250...
Page 61
All three currents (L1, L2 and L3) will appear in the program update! Several minutes current operational data when CTC EcoZenith i250 has may pass before the display identified the current transformers’ relevant phases. communicates clearly after restart.
Air must be supplied to the closed system. Operation stop The CTC EcoZenith i250 is shut down using the operating switch. If there is a risk of the water freezing, all the water should be drained from the heat pump and the radiator system (see drainage above).
General Information 10. Troubleshooting/appropriate measures The CTC EcoZenith i250 is designed to provide reliable operation and high levels of comfort, and to have a long service life. Various tips are given below which may be helpful and guide you in the event of an operational malfunction.
Page 64
Touch the entire radiator surface. Bleed the radiators. The CTC EcoZenith i250's economical operation demands a radiator system that functions effectively. • that CTC EcoZenith is operating and no error messages are displayed.
Page 65
In some cases, unusual noises may be produced by the house's pipe system and the CTC EcoZenith i250 due to the jolts which occur when the flow is quickly interrupted. There is no fault with the product, but the noise may occur when older model outlets are used.
“Heating from heating system 1/2” Smart: low price/overcap./blocking is also shown The product is operated on the basis of “Smart Grid”. Also see: “Define system / Remote control / Smart Grid”. CTC EcoZenith i250...
If the fault recurs, contact your installer. Low brine temp Incoming brine temperatures from borehole/ground loop are too low. Press reset and check whether the alarm recurs. If the fault recurs, contact your installer to check the dimensions of the cold side. CTC EcoZenith i250...
Page 68
Fuses This message appears when fuse F1 has been triggered. High compr. temp This message appears when the compressor temperature is high. Press reset and check whether the alarm recurs. If the fault recurs, contact your installer. CTC EcoZenith i250...
Page 69
Press reset and check whether the alarm recurs. If the fault recurs, contact your installer and tell them the error code number where applicable. Driver: Offline Communication error. The electrical connection box and driver of the heat pump are not communicating. CTC EcoZenith i250...
• Lifting band around the pallet. NB: Can only be used with the packaging on. Remember that the CTC EcoZenith i250 has a high centre of gravity and should be handled with caution. 11.2 Unpacking Unpack the CTC EcoZenith i250 when it is placed next to its installation site.
Start with the heat requirement in kW (e.g. 15 kW), then move vertically to the selected ∆t (e.g. 10 °C). Then move horizontally to the line for the CTC EcoZenith i250 mixing valve = line 6.3 DN20. The reading for the pressure drop is taken from the scale directly below (4 kPa).For CTC EcoZenith i250, see valve DN20.
Minimum inlet pressure: Insulation class: temperature Drehzahl P1 [W] Liquid temperature: +2 °C to +95 °C (TF 95) Equipment class: 0,04 Motor protection: Overload protection Approval and marking: VDE, CE CTC EcoZenith i250 0,52 Revision date: 1 november 2011 Maßskizzen und Klemmenkastenstellungen...
Installation 12.2 Schematic diagram This shows the main connection between the CTC EcoZenith i250 and the property’s radiator and hot water system. Different installations and systems may look different, such as a one- or two-pipe system, which means that the finished installation may be different.
Page 74
If the sub-mixing valve (radiator system 2) is to operate in the summertime while radiator system 1 is switched off, the system can be supplemented by an electric shut-off valve that closes the flow through the switching off of radiator pump (G1). CTC EcoZenith i250...
Page 75
The CTC EcoZenith i250 is best connected to a closed expansion vessel. The CTC EcoZenith i250 is designed to be fitted to an 18 l closed expansion vessel. The expansion vessel is either fitted in the area under the tank or on top of the product (see pictures).
The charge pump for the heat pumps is factory-installed in the CTC EcoZenith i250L. The CTC EcoZenith i250 L has pipes at the rear right edge for connection of the heat pump. The CTC Eco Air’s lower connection (5) is connected to the right connection (2) when viewed from the front, so that water is pumped out to the heat pump.
Page 77
250H (behind the diverting valves). The pump pumps water to the connected heat pump. Pipe connection for CTC EcoAir 400 Pipe connection for CTC EcoPart 400 Outgoing (heated) water to boiler. Incoming (cold) water from boiler. CTC EcoZenith i250...
You can connect a DHW circulation system. You can see this kind of connection in the figure below. DHW pump (G40)* BV (*G40 Not controlled by the product. Use a separate control or constant voltage on the circulation pump.) CTC EcoZenith i250...
If you are unsure how to make the connection, contact CTC for suggestions on how to install the system. Schematic diagram only The installer adds expansion vessels, safety valves, etc., and sizes the system. CTC EcoZenith i250...
Page 80
Solar output (3/4) H. Symbol of tank volume in CTC EcoHeat 400 and CTC EcoZenith i250. The tank in the CTC EcoHeat 400 and CTC EcoZenith i250 will be called the H-tank (main tank). Energy can be collected through the solar outputs (solar panels, wood-fired boiler) or generated (swimming pool).
Page 81
Installation System options, Energyfl ex The flexibility in the CTC EcoHeat and CTC EcoZenith i250 is optimised because the products contain functionality for five basic systems. These are: Solar "system 1" Solar "system 2" Solar "system 3" Diff thermostat function Pool Solar also offers the facility to recharge the drill hole or collect energy for an extra tank, with or without a solar coil.
The boiler is internally connected by the factory and set for a 5.5 + 6.0 kW power output. Depending on the country in which CTC EcoZenith i250 is to be installed, it is available with a 400 V or 230 V electrical connection.
Terminal block: G41-G48. Terminal block: A11-A20. Terminal block: G31-G40. Terminal block: A21-A30. Terminal block: G61–G76. Contactors. Electrical installation CTC EcoZenith i250 Lower immersion heater. Strain reliever. Heat pump power supply. The black connector that only supplies any connected heat pumps with power is connected here.
14.4 Electrical connection to heat pump General The CTC EcoAir 406-410, CTC EcoAir 510M or CTC EcoPart 406-412 heat pumps receive their power supply from the CTC EcoZenith i250 via a separate connector. Charge pump The factory-installed charge pump for heat pumps is connected internally in the Charge pump Molex switch CTC EcoZenith i250 L.
Installation 14.4.2 Heat pump power supply 400 V 3N~ The heat pump must be supplied with power from CTC EcoZenith i250 using the provided black connector located in the bottom of the electrical cabinet. (NB: no supply to CTC EcoZenith i250) The minimum group fuse size is specified in “Technical data”.
Apply contact paste to the front part of the sensor between the sensor and the pipe if good contact is otherwise difficult to obtain. • Important! Insulate the sensor using pipe insulation. • Connect the cables to the CTC EcoZenith’s terminal board. CTC EcoZenith i250...
The current sensors’ holes for cables are 11 mm in diameter. Use at least 0.5 mm cable. Connection block From electricity meter To boiler Low current Current sensor Fuse panel CTC EcoZenith i250...
There are terminal boards for sensors, radiator pumps, etc. behind the panel. Open the spring block first using a screwdriver before the cable is inserted. Otherwise, there is a risk of poor contact. Also make sure that the conductor is sufficiently stripped. CTC EcoZenith i250...
14.8 Switching to 18 kW electric heater Warning Begin power. by disconnecting the power to the CTC EcoZenith i250 3x400 V can be reconnected to a 18 kW immersion product. Installation heater. must be carried NB: Installation must be carried out by a qualified electrician.
Page 91
Then check that the switch is firmly in position on the DIN rail. 5. Mount the black wires in the free spaces on the electric heater. NB: Only for angled flat pins with black end cable sleeves. CTC EcoZenith i250...
Installation 14.9 Connection of pump (G46) to Diff. therm. func. 230 V 1N~ The Circulation pump (G46) is connected at the following terminal blocks: Relay card in the CTC EcoZenith i250 (see wiring diagram). Note the cable colours! Phase: brown Terminal block A:11(CTC EcoZenith i250)
-25 -20 -15 -10 -5 5 10 15 20 25 30 Outdoor ºC The CTC EcoZenith i250 is supplied with suitable factory settings for the CTC EcoAir 500M. Enertech AB recommend these for optimal operating economy. CTC EcoZenith i250...
23-24 Saturday 00-08 23-24 Sunday 00-08 22-24 The CTC EcoZenith i250 is supplied with suitable factory settings for the CTC EcoAir 500M. Enertech AB recommend these for optimal operating economy. Inst. Ljudreducering CTC EcoZenith i250 Silent mode Active Monday 00-06...
Saturday 00-08 23-24 speed of the compressor at outdoor temperature T2 Sunday 00-08 22-24 The CTC EcoZenith i250 is supplied with suitable factory settings for the CTC EcoAir 500M. Enertech AB recommend these for optimal operating economy. CTC EcoZenith i250...
Find out more in section entitled Define/Remote control/Smart Grid The CTC EcoZenith i250 is supplied with suitable factory settings for the CTC EcoAir 500M. Enertech AB recommend these for optimal operating economy. CTC EcoZenith i250...
Noise reduction has been activated (On) and noise reduction is currently in progress (On – Active) The CTC EcoZenith i250 is supplied with suitable factory settings for the CTC EcoAir 500M. Enertech AB recommend these for optimal operating economy. CTC EcoZenith i250...
Installation CTC EcoAir 520M 16. First start When the CTC EcoZenith i250 is delivered, the heat pump is blocked to avoid it being started unintentionally. CTC EcoZenith I250 can be installed and started before the bedrock/ground source or air/water heat pump is put into operation.
Page 106
Specify inclination 1 for radiator system 1. 10. Specify the adjustment for radiator system 2. 11. Current sensors identified. The CTC EcoZenith i250 then starts and the start menu appears. 12. Enter the set values in the parameter list so that the customer knows what has been set in addition to factory settings during installation.
Enertech AB Box 313 S-341 26 LJUNGBY Försäkran om överensstämmelse Déclaration de conformité Declaration of conformity Konformitätserklärung Declaration of försäkrar under eget ansvar att produkten, Conformity confi rme sous sa responsabilité exclusive que le produit, declare under our sole responsibility that the product, erklären in alleiniger Verantwortung, dass das Produkt, EZ250 C1 3x400V E18/ EZ250 C1 1x230V E12 EZ250 C1 3x230V E14...