162 105 39-2 2016-04-25 Providing sustainable energy solutions worldwide Installation and Maintenance Manual CTC EcoTank 300/310 IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE REFERENCE...
Table of Contents GENERAL INFORMATION Technical data ______________________________________________________ Safety Instructions ______________________________________________ General _________________________________________________________________ Cross-section __________________________________________________ Important to remember! ____________________________________ Delivery for EcoTank 300 includes ______________________ Inspection and maintenance _______________________________ Filling _____________________________________________________________ Draining _________________________________________________________ Troubleshooting ______________________________________________ For installers ________________________________________________________ Schematic diagram of pipe connections...
General Information General Information Technical data CTC EcoTank 300 CTC EcoTank 310 Net weight 138 kg 128 kg Volume 318 l 318 l Max. operating pressure 3.0 bar / 0.3 MPa 3.0 bar / 0.3 MPa Max. operating temperature 110ºC 110ºC...
Both versions have a volume of 318 l and inbuilt baffles for optimal performance. Polyurethane insulation is used to minimise heat loss. The product is compatible with the other products in the CTC range. • CTC EcoTank 300 is intended to be connected to a CTC EcoZenith i250 or CTC EcoHeat and is equipped with a built-in expansion tank.
Report any transport damage to the carrier. • Before installation, check that the delivery is complete (See “Delivery includes” section). Delivery for EcoTank 300 includes CTC EcoTank 310 is supplied without this bipack. Designation Quantity Sealing washer Expansion tank 10 litre (incl.
The safety valve is not supplied with CTC EcoTank 310. Filling Fill EcoTank 300/310 according to the following: Connect the water supply to the draining/filling valve. Start filling (turn the safety valve in equal stages to release the air from the system).
• Remove the packaging and check before installation that the product has not been damaged in transit. Report any transport damage to the carrier. • Before installation, check that the delivery is complete (See “Delivery includes” section). Schematic diagram of pipe connections CTC EcoTank 300 CTC EcoTank 310 CTC EcoTank 300...
The pipe’s outlet shall be visible. For CTC EcoTank 300 Connect the expansion tank and the tank using the T-connection and the safety valve according to the illustration below:...