Important
If any hoses or wiring on the tank skid
assembly are being pinched or bent, raise the assembly up,
adjust its positioning, and tie items back.
5. Line up the pivot lug at the rear of the tank skid
assembly with the opening at the end of the vehicle
frame (Fig 18).
1
3
Figure 18
Left side shown
1. Pivot lug
2. Clevis pin, (3/4 inch)
6. Install a clevis pin (3/4 inch) and two lynch pins to the
pivot lug to secure the tank assembly to frame
(Fig 18).
7. Repeat on the opposite side.
Attaching the Pump Drive
8. Pull rearward on the rubber cowling of the front of the
PTO drive shaft and install the drive shaft onto the
PTO output shaft (Fig. 19).
Important
Verify the PTO shaft is secured by making
sure the locking balls are seated in the groove of the
output shaft.
2
4
3. Lynch pin
4. Vehicle frame
19
1
2
Figure 19
1. Rubber cowling
2. PTO drive shaft
Finishing the Tank Skid Installation
9. Line up the front mounting brackets with the hold
down brackets installed previously.
10. Secure the tank skid assembly to the frame with a bolt
(1/2 x 1-1/2 inch), two washers (1/2 inch), and a
locknut (1/2 inch) as shown in figure 20.
1
2
Figure 20
Left side shown
1. Front mounting bracket
2. Hold -down bracket
3. Bolt, 1/2 x 1-1/2 inch
11. Repeat these steps for the front mount and hold-down
bracket on the opposite side.
2
3. PTO output shaft
3, 4
4, 5
4. Washer, 1/2 inch
5. Locknut, 1/2 inch

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workman 200

Table of Contents