Description
Hold-down brackets
Radiator cover
Radiator panel
Bolts, 3/8 x 1 inch
Bolts, 1/4 x 3/4 inch
Tank and skid assembly
Clevis pins
Lynch pins
Bolts, 1/2 x 1-1/2 inch
Washers, 1/2 inc
Nuts, 1/2 inch
Knob
J–clips
Bolt, 1/4 x 3/4 inch
Flange nut, 1/4 inch
Boom holder assembly, left
Boom holder assembly, right
Operator's Manual
Operator's Video
Parts Catalog
Selection Guide
Registration Card
Predelivery Inspection Form
Removing Existing Bed
1. Start the engine. Engage the hydraulic lift lever and
lower the bed until cylinders are loose in slots. Release
the lift lever and the turn off engine.
2. Remove the lynch pins from the outer ends of the
cylinder rod clevis pins (Fig. 2).
Qty.
Use
2
Installing the attachment hold-down brackets.
1
1
Installing the radiator cover.
4
3
1
2
4
Installing the tank skid.
2
4
2
1
3
Installing the control box.
1
1
1
Installing the boom holders.
1
1
Read before operating the machine.
1
Watch before operating the machine.
1
Use for ordering replacement parts.
1
Use for selecting nozzles.
1
Complete and return to Toro.
1
Complete and file in your customer history portfolio.
1
6
1. Bed mounting plate
2. Cylinder rod end
3. Clevis pin
12
5
4
3
2
Figure 2
4. Lynch pin
5. Rear slots (Full bed)
6. Front slots (2/3 bed)
m–7148