Chapter 2 Single UPS Installation And Commissioning
Storage environment
When the UPS does not need to be installed immediately, the UPS must be stored indoors to be protected from the
excessive moisture or overtemperature environment. The battery requires dry and low temperature, well-ventilated
environment for storage, and the most suitable storage temperature is 20° C ~ 25° C.
During the battery storage, the battery must be periodically charged according to the battery instructions. When the battery is
charged, you can connect the UPS to the mains temporarily to charge and activate the battery.

2.2.3 Installation Tools

Prepare installation tools according to Table 2-1. The tools must be insulated and ESD-proof processed prior to use.
Installation tool
Cross screwdriver
Wire-pressure plier
Diagonal plier
Slotted screwdriver

2.3 External Protective Devices

The circuit breaker or other protective devices must be installed at the external AC input end of the UPS. This section
provides the general guidance for qualified installation engineer. The qualified installation engineer should learn about
the local wiring regulations and other related information.

2.3.1 Battery Input

If the battery module option is provided by Emerson, the battery module has a built-in overcurrent protective device.
Otherwise, the external battery cabinet should equip a DC compatible circuit breaker to provide overcurrent protection
for the UPS and its batteries.

2.3.2 UPS Output

A protective device must be installed for the UPS output power distribution. The protective device must be different
from the input power distribution protection air breaker, and should provide overload protection (see Table 2-4).

2.4 Mechanical Installation

Two installation modes are available: tower installation and rack installation. You can select an appropriate installation
mode according to the actual conditions.

2.4.1 Tower Installation

1. Adjust the display panel.
1) Press the spring buckles on two sides of the display panel at the same time, and pull out the display panel.
2) Rotate the display panel 90° counter clockwise.
3) Insert the display panel into the plastic bracket.
The operation procedures of the display panel are shown in Figure 2-2 when the mode is changed from the rack
installation to the tower installation.
警告 危 险
Table 2-1 Installation tools list
Specification
EJ5100mm
Remove the screws of the top protective cover of the UPS, or open the chassis
YT-12
Press wires for I/O terminal block
MTC3C
Make I/O cables
EJ375mm
Connect I/O cables
Liebert
ITA 10kVA UPS User Manual
®
Warning: battery hazards
Application

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uha1r-0100l

Table of Contents