Liebert UHA1R-0100 User Manual

Liebert UHA1R-0100 User Manual

Ita 10kva ups
Table of Contents

Advertisement

Liebert
ITA 10kVA UPS
®
User Manual
Version
V1.2
Revision date
July 3, 2012
BOM
31012534
Emerson Network Power provides customers with technical support. Users may contact
the nearest Emerson local sales office or service center.
Copyright © 2011 by Emerson Network Power Co., Ltd.
All rights reserved. The contents in this document are subject to change without notice.
Emerson Network Power Co., Ltd.
Address: No.1 Kefa Rd., Science & Industry Park, Nanshan District 518057, Shenzhen
China
Homepage: www.emersonnetworkpower.com.cn
E-mail: support@emersonnetwork.com.cn

Advertisement

Table of Contents
loading

Summary of Contents for Liebert UHA1R-0100

  • Page 1 Liebert ITA 10kVA UPS ® User Manual Version V1.2 Revision date July 3, 2012 31012534 Emerson Network Power provides customers with technical support. Users may contact the nearest Emerson local sales office or service center. Copyright © 2011 by Emerson Network Power Co., Ltd.
  • Page 3: Safety Precautions

    Safety Precautions This user manual contains the information concerning the installation and operation of Liebert ITA 10kVA UPS ® (hereinafter referred to as UPS). Please carefully read this user manual prior to installation. 警告 危 险 Warning 1. The UPS must be installed and commissioned by engineers designated by the manufacturer or its agent. Failure to observe this could result in personnel safety risk, UPS malfunction and invalidation of warranty.
  • Page 4 警告 危 险 Conformity and standards The UPS complies with CE 2006/95/EC (LV Safety) and 2004/108/EC (EMC), and with the following product standards for UPS:  IEC 62040: 2008 General and safety requirements  IEC62040-2: EMC requirements, Class C2 compliant ...
  • Page 5: Table Of Contents

    Contents Chapter 1 Product Introduction ............................1 1.1 Features ................................1 1.2 Model Configurations ............................1 1.3 Appearance And Components ..........................2 1.3.1 Appearance ............................... 2 1.3.2 Components .............................. 2 1.4 Operating Principle ............................... 3 1.5 UPS State And Operation Mode ........................... 3 1.5.1 Normal Mode .............................
  • Page 6 Chapter 3 Parallel UPS Installation And Commissioning ....................28 3.1 Features ................................28 3.2 Requirements..............................28 3.3 Mechanical Installation ............................28 3.4 Connecting Cables .............................. 29 3.4.1 Connecting I/O Cables..........................29 3.4.2 Connecting Parallel Signal Cables ......................30 3.5 Setting Parallel Addresses ..........................31 3.6 Commissioning Parallel System..........................
  • Page 7 Chapter 6 Communication ..............................45 6.1 Connecting USB Communication Cable ......................45 6.2 Installing Communication Assembly (Optional) ....................45 6.2.1 SIC Card ..............................45 6.2.2 JBUS/MODBUS Adapter Card ........................ 45 6.2.3 RS485 Card ............................. 46 6.2.4 RS232 Card ............................. 46 6.2.5 Dry Contact Card .............................
  • Page 9: Chapter 1 Product Introduction

    Chapter 1 Product Introduction Chapter 1 Product Introduction The Liebert ITA 10kVA UPS (UPS for short) is an intelligent online UPS system with sine wave output developed by ® Emerson Network Power Co., Ltd. The UPS offers reliable and high quality AC power to the precision instrument.
  • Page 10: Appearance And Components

    Bypass terminal block Bypass MCB DIP switch Parallel port Ventilation hole Input MCB Battery port USB port REPO port 10A charger control port Intelligent card slot I/O terminal block Figure 1-3 UPS rear panel Liebert ITA 10kVA UPS User Manual ®...
  • Page 11: Operating Principle

    The operation schematic diagrams of Normal mode, Bypass mode, Battery mode and Maintenance Bypass mode are shown in Figure 1-5. 警告 危 险 Note Only when the UPS output power distribution unit (POD for short) is configured, the Maintenance Bypass mode is valid. Liebert ITA 10kVA UPS User Manual ®...
  • Page 12: Normal Mode

    警告 危 险 Note In case of mains failure or mains voltage out of range (120Vac ~ 253/264/276Vac) in Bypass mode, the UPS will turn off and stop the output. Liebert ITA 10kVA UPS User Manual ®...
  • Page 13: Battery Mode

    MCB, and the power to the load is not interrupted. The maintenance bypass MCB is located on the front panel of the POD, and the capacity meets the requirements of the total load capacities. Refer to Liebert ®...
  • Page 14: Specifications

    The specifications are listed in Table 1-2. Table 1-2 Specifications Standard model Long back-up model Item UHA1R-0100 UHA1R-0100L Rated voltage Single-phase: 220Vac, 3-phase: 380Vac, voltage type of 230Vac and 240Vac is available 176Vac ~ 288Vac, at full load Voltage range...
  • Page 15 Chapter 1 Product Introduction Standard model Long back-up model Item UHA1R-0100 UHA1R-0100L IEC/EN 61000-4-5, endurance level 4 (4kV) (live line to earth), level 3 (2kV) (among live Surge protection lines) Protection level IP20 Operating temperature 0° C ~ 40° C Storage temperature -40°...
  • Page 16: Chapter 2 Single Ups Installation And Commissioning

    If necessary, an indoor exhaust fan should be installed to keep the indoor temperature from rising. An air filter should be used in a dusty environment where the UPS is to be operated. Liebert ITA 10kVA UPS User Manual ®...
  • Page 17 When the UPS uses an external battery, you must install a battery protective device (such as a fuse or a circuit breaker) in areas near the battery, and use the shortest wiring distance for the connection between the protective device and the battery. Liebert ITA 10kVA UPS User Manual ®...
  • Page 18: Installation Tools

    3) Insert the display panel into the plastic bracket. The operation procedures of the display panel are shown in Figure 2-2 when the mode is changed from the rack installation to the tower installation. Liebert ITA 10kVA UPS User Manual ®...
  • Page 19 3. Take out the support bases from the accessories, assemble a pair of support bases together through the fastenings, as shown in Figure 2-4, and put them onto the flat installation table. Liebert ITA 10kVA UPS User Manual ®...
  • Page 20: Rack Installation

    2. Take out the two brackets and six M4 × 10 screws from the accessories of the UPS, and fix the two brackets onto the battery module using the M4 × 10 screws through installation hole 1, as shown in Figure 2-7. Liebert ITA 10kVA UPS User Manual...
  • Page 21 3) Align the installation holes of the guide rail with the square holes of the rack, fix the guide rail onto the rack with the guide rail screws, each left guide rail and right guide rail need four guide rail screws, as shown in Figure 2-10. Liebert ITA 10kVA UPS User Manual...
  • Page 22  Install the battery modules first, start the installation from the bottom, and then place the UPS onto the top, as shown in Figure 2-13.  It is prohibited to move the UPS and battery modules through the brackets.  Two persons or more are required for the installation. Liebert ITA 10kVA UPS User Manual ®...
  • Page 23: Connecting Power Cables

    Input interface capability of input Battery MCB Output interface capability of output external MCB external MCB 10kVA (1-input 1-output) Terminal block 125A DC63A Terminal block 10kVA (3-input 1-output) Terminal block 125A DC63A Terminal block Liebert ITA 10kVA UPS User Manual ®...
  • Page 24: Connecting I/O Cables

    4. Install a three-pole or quadrupole linkage breaker on the mains input neutral line and live line to facilitate cutting power under emergency conditions. Use correct power distribution method (see Figure 2-16) to ensure safety of the UPS and user’s equipment. Liebert ITA 10kVA UPS User Manual ®...
  • Page 25 (N) and output earth line terminal (PE) of the UPS I/O terminal block, and tighten the fixing screws, as shown in Figure 2-18. 7. Install the protective cover B of the I/O terminal block, and then restore the protective cover of the bypass terminal block. Liebert ITA 10kVA UPS User Manual ®...
  • Page 26 The factory default power distribution mode of the UPS is 1-input 1-output. If you need to change the power distribution mode of the main UPS to 3-input 1-output, conduct the steps described in the following to change the power distribution mode to 3-input 1-output, and then continue the installation and commissioning. Liebert ITA 10kVA UPS User Manual ®...
  • Page 27 (N) and output earth line terminal (PE) of the UPS I/O terminal block, and tighten the fixing screws, as shown in Figure 2-21. 8. Install the protective cover B of the I/O terminal block, and then restore the protective cover of the bypass terminal block. Liebert ITA 10kVA UPS User Manual ®...
  • Page 28: Connecting Battery Cables

    5. Turn off the UPS before replacing the battery and connecting the battery cables. Connecting battery cables of standard UPS The standard UPS provides a battery cable A (length: 0.5m), which is used to connect the battery module to the UPS, as shown in Figure 2-23. Liebert ITA 10kVA UPS User Manual ®...
  • Page 29 If the OT terminal does not match the connection terminals of the battery input MCB, cut the OT terminal and peel the battery cable B to an appropriate length of copper core, and then connect the battery cable B to the battery input MCB. Liebert ITA 10kVA UPS User Manual...
  • Page 30 4. Insert one end of the battery module accessory cable to the other port of the battery module 2, and the other end to one of the ports of the battery module 3. Repeat the preceding procedures. Liebert ITA 10kVA UPS User Manual...
  • Page 31: Connecting 10A Charger Cable

    2. Remove the protective cover of the 10A charger control port on the rear panel of the UPS, insert the other end of the cable into the 10A charger control port, as shown in Figure 2-28, and fasten the fixing screws of the cable. Liebert ITA 10kVA UPS User Manual...
  • Page 32: Single Ups Commissioning

    4. The output terminals of the UPS and the POD (if configured) are energized upon the startup. If the load is connected with the output terminals, make sure that the power to the load is safe. Liebert ITA 10kVA UPS User Manual...
  • Page 33: Single Ups Parameters Setting

    2. Power on the UPS to enter the UPS self-test status (including the battery self-test), all the LED indicators blink, and the buzzer beeps at intervals. After the self-test is finished, the UPS enters the standby mode, and the mains indicator turns on, as shown in Figure 2-30. Liebert ITA 10kVA UPS User Manual ®...
  • Page 34: Battery Mode Startup

    2. Press the ON/SILENCE key for more than one second, and wait for about 30 seconds, the UPS will enter the inverter standby mode automatically, at this time, the inverter indicator blinks. After the UPS has output, the inverter indicator will turn on, as shown in Figure 2-32. Liebert ITA 10kVA UPS User Manual ®...
  • Page 35 Chapter 2 Single UPS Installation And Commissioning ON/SILENCE key O N / S I L E N C E k e y Figure 2-32 Indicator status Liebert ITA 10kVA UPS User Manual ®...
  • Page 36: Chapter 3 Parallel Ups Installation And Commissioning

    UPS and the battery module should be installed in turn, and the POD should be installed on the top. 3. The installation method of the POD is the same as that of the UPS. Liebert ITA 10kVA UPS User Manual...
  • Page 37: Connecting Cables

    3-input 1-output. Using POD power distribution The UPS parallel system uses the POD provided by Emerson to perform power distribution. Refer to Liebert ® 10kVA UPS Parallel Power Distribution Unit User Manual delivered with the POD for the power cable connection.
  • Page 38: Connecting Parallel Signal Cables

    UPS2 UPS3 UPS4 Figure 3-3 Cable connection schematic diagram of 3 + 1 parallel system 警告 危 险 Note The parallel signal cables provided by Emerson must be used for the parallel system. Liebert ITA 10kVA UPS User Manual ®...
  • Page 39: Setting Parallel Addresses

    2. The default setting of all the DIP switch is OFF. However, you should set the DIP switch position for the parallel system according to the descriptions listed in Table 3-1. Otherwise, a UPS fault will occur. 3.6 Commissioning Parallel System Refer to Liebert ITA 10kVA UPS Parallel Power Distribution Unit User Manual for details of the parallel system ®...
  • Page 40 Warning During the startup of the parallel system, confirm that the external output MCB of each UPS has been closed, and that all the inverter output of the UPSs has been connected parallelly. Liebert ITA 10kVA UPS User Manual ®...
  • Page 41: Chapter 4 Display Panel

    The UPS load battery capacity and fault orientation indicators indicate the load situation of the UPS. In Battery mode, they indicate battery capacity. Upon UPS failure, they work with the UPS state indicators to indicate fault type of the UPS. Liebert ITA 10kVA UPS User Manual ®...
  • Page 42 UPS is in Normal mode, the mains indicator and inverter indicator are on. The short fault, charger failure and EPO fault can be recoverable after shutdown of the UPS 警告 危 险 Note Indicator 5 is yellow, indicator 6 is red and other indicators are green. Liebert ITA 10kVA UPS User Manual ®...
  • Page 43: Control Keys

    Pressing and holding this key continuously for less than 1s shifts menu items, the selected contents will be NEXT key displayed highlighted. Pressing and holding this key continuously for more than 1s turns on/turns off the backlight on the LCD Liebert ITA 10kVA UPS User Manual ®...
  • Page 44 The interfaces of the LCD display screen include start interface and menu interface. 1. Start interface The start interface displays the UPS series, product type and company name for about 20 seconds. The start interface is shown in Figure 4-3. Liebert ITA 10kVA UPS Emerson Network Power Co., Ltd.
  • Page 45 Set the self-test cycle of the battery Disabled ECO function Set whether the ECO function is active Disabled EOD startup Set whether the startup is automatic Enabled Language Set the LCD displayed language Chinese Liebert ITA 10kVA UPS User Manual ®...
  • Page 46: Chapter 5 Ups Operation Instructions

    120Vac ~ 253/264/276Vac. After the self-test is complete, the UPS enters the standby mode, the mains indicator is on, as shown in Figure 5-1. Figure 5-1 Indicator status Liebert ITA 10kVA UPS User Manual ®...
  • Page 47: Turning On Ups

    4. In Bypass mode, the load is powered by the mains supply directly instead of the pure power of the inverter output. 5.4 Battery Self-test The battery self-test includes battery power-on self-test, battery manual self-test and battery periodic self-test. Liebert ITA 10kVA UPS User Manual ®...
  • Page 48: Battery Power-On Self-Test

    (battery not connected or battery failure), the fault indicator will turn on, the battery indicator will blink, as shown in Figure 5-5. Liebert ITA 10kVA UPS User Manual...
  • Page 49: Turning Off Ups

    Battery indicator is off, as shown in Figure 5-7. If you need to power off the UPS completely, press and hold the OFF key for 10 seconds. Figure 5-7 Indicator status Liebert ITA 10kVA UPS User Manual ®...
  • Page 50: Ups Power-Off

    5.7.3 Transferring UPS To Inverter Mode From Bypass Mode Manually In Bypass mode, press and hold the ON key for two seconds. After the inverter operates normally, the UPS will transfer to Inverter mode. Liebert ITA 10kVA UPS User Manual ®...
  • Page 51: Transferring Ups To Battery Mode From Mains Failure

    1. Close the output MCB on the front panel of the POD. 2. Close the main input MCB and bypass input MCB on the front panel of the POD. Liebert ITA 10kVA UPS User Manual ®...
  • Page 52: Ups Complete Shutdown

    2. If the Auto Start function is not set, you can start the UPS manually by pressing the ON/SILENCE key. 5.10 UPS Monitoring For the operation methods of the UPS background monitoring, refer to SiteMonitor monitoring software delivered with the UPS. Liebert ITA 10kVA UPS User Manual ®...
  • Page 53: Chapter 6 Communication

    Emerson. The adapter card can also enables the user to obtain the devices working status by acquiring various electrical parameters, running state and fault types of the devices. For the detailed installation and operation guide of the adapter card, refer to the relevant user manual. Liebert ITA 10kVA UPS User Manual ®...
  • Page 54: Rs485 Card

    Chapter 6 Communication 6.2.3 RS485 Card The RS485 card should be used together with the Liebert ITA series UPS of Emerson to realize the signal transform ® from RS232 to RS485. For the detailed installation and operation guide of the RS485 card, refer to the relevant user manual.
  • Page 55: Chapter 7 Maintenance And Troubleshooting

    Contact Emerson or nearby office to obtain the detailed information of Emerson recycle system about waste and old battery. Liebert ITA 10kVA UPS User Manual...
  • Page 56: Cleaning Ups

    Check that the UPS input cables are connected properly UPS is in Battery mode connected No UPS alarm generates, but Output cables improperly Ensure that the output cables are connected properly the UPS has no output voltage connected Liebert ITA 10kVA UPS User Manual ®...
  • Page 57 AC power capacity The fault indicator is on, and 1. Open the UPS mains switch; the buzzer beeps for a long Parallel address is wrong 2. Reset the parallel configuration address time Liebert ITA 10kVA UPS User Manual ®...
  • Page 58 If you need to report the UPS fault to Emerson or the dealer, please record and inform the UPS model and code (the bar code on the back of the UPS chassis). If the UPS is a long back-up UPS, you should also provide the battery configuration information. Liebert ITA 10kVA UPS User Manual ®...
  • Page 59: Chapter 8 Options

    Extended dry contact card assembly for UPS Communication UF-DRY310 Dry contact card and its options for UPS options UF-MODBUS210 MODBUS assembly for Liebert NX and ITA UPS UF-RS485 RS232 to RS485 communication assembly for ITA UPS UF-RS232 RS232 communication card options for Liebert ITA UPS ®...
  • Page 60: Appearance Of Battery Module

    There are battery ports, battery fuse box and ventilation holes on the rear panel of the battery module, as shown in Figure 8-3. Battery fuse Ventilation hole Battery port 1 Battery port 2 Figure 8-3 Rear panel of the battery module Liebert ITA 10kVA UPS User Manual ®...
  • Page 61: Backup Timetable Of Standard Battery Module For Single Ups

    Plastic panel Figure 8-4 Appearance of the 1-input 1-output 1 + 1 parallel POD Remove the plastic panel to reveal the operation panel of the 1-input 1-output parallel POD, as shown in Figure 8-5. Liebert ITA 10kVA UPS User Manual ®...
  • Page 62: 3-Input 1-Output 1 + 1 Parallel Pod

    UPS1 input MCB UPS2 input MCB UPS2bypass MCB UPS1 output MCB UPS2 output MCB Maintenance bypass MCB (with protective cover) Figure 8-8 Operation panel of the 3-input 1-output 1 + 1 parallel POD Liebert ITA 10kVA UPS User Manual ®...
  • Page 63: 3-Input 1-Output 3 + 1 Parallel Pod

    UPS3 bypass UPS4 input MCB UPS4 output MCB (with protective cover) UPS3 input MCB UPS3 output MCB UPS4 bypass MCB Figure 8-11 Operation panel of the 3-input 1-output 3 + 1 parallel POD Liebert ITA 10kVA UPS User Manual ®...
  • Page 64: Output Power Distribution Unit

    16 A output socket (6 pcs) Output control MCB of terminal block (2 pcs) Socket output control MCB (6 pcs) Output terminal block (2 rows) Input port (1 piece) Figure 8-14 Operation panel of the output power distribution unit Liebert ITA 10kVA UPS User Manual ®...
  • Page 65: Complete Set Of Cables

    (can be connected to through TCP/IP protocol and Internet; the net port type of UF-SNMP810 Support remote safety shutdown function; temperature/humidity Provide an extended net port, cascade at most 8 sensor) temperature/humidity sensors Liebert ITA 10kVA UPS User Manual ®...
  • Page 66: Charger

    Description Weight (width × height × depth, mm) Charge for battery with large capacity, and UF-BCH192/10 10A charger used together with Liebert ITA 5kVA, 6kVA, 435 × 85 × 380 12kg ® 10kVA UPS to shorten the charging time The appearance of the 10A charger is shown in Figure 8-15.
  • Page 67: Assembly Of Lcd Display Panel

    1. Make sure that the UPS is powered off, bypass MCB and I/O MCBs are open, and the battery cables has been disconnected. 2. Press the two ends of the UPS plastic panel by hand, gently pull the plastic panel outwards to remove it, as shown in Figure 8-18 (a). Liebert ITA 10kVA UPS User Manual ®...
  • Page 68: Battery Shared Module Of Uf-Bso-0100 Ita Ups

    10kVA UPSs at the same time. The appearance of the battery shared module is shown in Figure 8-19. See Table 8-10 for its description. Operation display panel Ventilation hole Figure 8-19 Appearance of the battery shared module Liebert ITA 10kVA UPS User Manual ®...
  • Page 69 Input port 1 Ventilation hole Output port 1 Figure 8-20 Rear panel of the battery shared module For details of the battery shared module, refer to UF-BSO-0100 ITA UPS Battery Shared Module User Manual. Liebert ITA 10kVA UPS User Manual ®...
  • Page 70: Appendix 1 Operation Guide For Ups Parallel Power Distribution

    BAT + and the BAT - should be laid side by side and be the same direction. Figure 1 Schematic diagram of power distribution Liebert ITA 10kVA UPS User Manual ®...
  • Page 71: Appendix 2 Glossary

    PE: Protective earth POD: Power distribution unit RCCB: Residual current circuit breaker RCD: Residual current detector REPO: Remote emergency power off SPM: Server power management system STS: Static transfer system UPS: Uninterruptible power system Liebert ITA 10kVA UPS User Manual ®...

This manual is also suitable for:

Uha1r-0100l

Table of Contents