FIREPLACE CLEARANCES

The fireplace may be placed directly on a combustible
floor, against a combustible wall at marked clearances, or
on a raised wooden platform.
If the fireplace is to be installed on a raised wooden
platform, the platform must be a continuous level surface.
The fireplace must be secured in place so it cannot shift
positions. The nailing flanges on the sides of the firebox
make securing it to the framing easy. They were designed
to allow the installation of 1/2" wallboard or plywood flush
with the face of the fireplace.
Only the header (see Figure 2) may rest on the standoffs
on top of the firebox.
When the firebox is installed over carpeting, vinyl tile, or
This list of specific instructions will help you make certain that every
installation operation is performed correctly. Complete the installation
steps in the sequence shown.
LOCAL BUILDING CODES SHOULD BE CONSULTED IN ALL CASES AS
TO
THE
PARTICULAR
INSTALLATION OF FACTORY BUILT FIREPLACES.
for the fireplace by taking into consideration the factors previously
outlined in the "Choosing the Location." See page 6.
Framing the Firebox
The width of the framed opening must be 31 7/8". The height of the
framed opening must be 32 3/16". The entire fireplace can be elevated
above the floor to achieve a raised hearth effect. This can be done by
adding a small platform to achieve the desired height.
NOTE: The wiring for the lower blower must be installed during the
framing stage. The nailing flanges on both sides were designed to allow
the installation of 1/2" wallboard or plywood flush with the face of the
fireplace.
When the framing is inside, the outside wall will be insulated. If the
framing or chase is outside, thin insulation should be used in the
framing on the back, sides, and top. The bottom should be insulated
with a hard insulating board. This will prevent cold from going into the
chase through the fireplace to the living space.
Install the firebox into the framed opening by placing it directly in front
of the opening and sliding it into the proper position.
Check the level of the firebox on the top edge of the fireplace face.
Shim if necessary.
Secure the fireplace to the framing. The nailing flanges on the firebox
will make securing the firebox to the frame quick and easy. Use
appropriate size nails or screws to secure the firebox.
INSTALLING THE FIREBOX
REQUIREMENTS
CONCERNING
Install the Firebox
Level the Firebox
Secure the Firebox
any combustible material other than wood flooring, it
must be installed on a metal or wood panel extending its
full width and depth. Alternatively, the carpeting, vinyl
tile, etc. may be removed beneath the fireplace before
installing.
COMBUSTIBLE MATERIALS MUST NOT BE INSTALLED
OVER OR TOUCH ANY BLACK PAINTED SURFACE. DO
NOT BLOCK HEAT CIRCULATING AIR OUTLETS. DOING
SO MAY RESULT IN POTENTIAL FIRE HAZARDS
1. Sidewall Clearances: Clearances from the side of the
fireplace opening to any adjacent combustible wall
should not be less than 7"right side, 7" left side.
2. Ceiling Clearances: The ceiling height should
not be less than 42" from the top of the fireplace
opening.
THE
Select the location
FRAMING
HEADER
32 3/16
Page 8
"
25
LEFT
FRONT
*7"
"
31 7/8
"
*Note: Minimum 1/2
clearance
SIDE VIEW
"
13 1/2
32 3/16
FRONT VIEW
"
"
31 7/8
.
"
1/2
"
13 1/2
RIGHT
"