Chapter 8. Mcr Unit : Up-E13Mr - Sharp UP-600 Installation Manual

Hide thumbs Also See for UP-600:
Table of Contents

Advertisement

9) Install the core
to the LAN cable
11
10
1
NOTE: Install the ferrite core in a position less than 50 mm from
the cabinet.
Core
IN-LINE cable
Within 50mm

CHAPTER 8. MCR UNIT : UP-E13MR

1) Align the MCR sheet
cabinet
.
2) Mark 3 points of the asterisk mark on the MCR sheet
3) Aligning with the markings, secure the MCR angle 1
top cabinet
with 3 screws
.
Cabinet
with the positioning line of the top
.
1
to the
.
4) Install the MCR unit
to the MCR angle 1
2 screws
.
5) Remove the rear cover.
6) Connect the MCR cable
to the MCR connector
7) Fix the earth wire
to the main chassis
8) Install the core
to the MCR cable
two wire bands.
9
10
1
and secure with
.
with a screw
.
and earth wire
with
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Up-700

Table of Contents